My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment to Owner-Engineer Agreement - Traffic Analysis and Design Services for Eddy St. & Howard St. Inter – Abonmarche Consultants
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
Amendment to Owner-Engineer Agreement - Traffic Analysis and Design Services for Eddy St. & Howard St. Inter – Abonmarche Consultants
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2020 7:12:16 PM
Creation date
11/24/2020 7:12:04 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/24/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 <br />(Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />This is EXHIBIT K, consisting of 3 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated April 14, 2020,. <br />AMENDMENT TO OWNER-ENGINEER AGREEMENT <br />Amendment No. 1 <br />1.Background Data: <br />a. Effective Date of Owner-Engineer Agreement: April 14, 2020 <br />b. Owner: Board of Public Works, City of South Bend <br />c.Engineer: Abonmarche Consultants, Inc. <br />d.Project: Howard Street Conceptual Design <br />2.Description of Modifications: <br />a. The Scope of Services currently authorized to be performed by Engineer in accordance <br />with the Agreement and previous amendments, if any, is modified as follows: <br />Task Order # 1: Traffic Analysis <br />i. Traffic Analysis shall include a capacity analysis of the intersection of Howard <br />Street and Eddy Street and of Howard Street and SR 23 as requested during the <br />development of the conceptual alternatives. <br />ii. Review updated traffic count data provided by the City. Update the traffic analysis <br />of these two intersection. The updated report will include an analysis of the current <br />condition, the projected condition in 2022 following planned development, and <br />2040 condition including planned development and projected growth rate. <br />Task Order # 2: Phase 1 Design <br />i. Survey, design, special provisions and bid documents, easement or property <br />acquisition, permitting, and bid period services of the following intersection: <br />a. Howard Street and Eddy Street <br />b. Howard Street and SR 23 <br />c. Corby Boulevard and South Bend Avenue <br />d. Notre Dame Avenue and South Bend Avenue (Topographical survey to be <br />provided by the City) <br />ii. Construction Administration services including review of shop drawings, attend <br />progress meetings as requested, respond to questions as requested. Construction <br />Administration will be performed at an hourly rate, not to exceed, as requested by <br />the City. <br />Task Order # 3: Project Coordination
The URL can be used to link to this page
Your browser does not support the video tag.