Laserfiche WebLink
<br />Version 4/2/2019 Page - 11 Public Works Quote <br />(vii) Valve actuators and accessories shall be factory mounted on the valve, calibrated, and <br />tested. <br />d. Field quality control: <br />(i) Field test and calibrate equipment to demonstrate to the Owner's representative that all <br />equipment will satisfactorily perform the functions and criteria per manufacturer. <br />(ii) Provide all test apparatus required at no extra cost to Owner. <br />(iii) Follow testing procedures recommended by the manufacturer and approved by the Owner. <br />(iv) All valves shall be free from leaks. Each leak that is discovered within testing shall be <br />repaired by and at the expense of the Contractor. <br /> <br />XXV. PLANS <br /> <br />A. Prevailing Specifications: City of South Bend Design and Construction Standards <br />B. Additions: <br /> <br />1. Attachments: <br />a. Exhibit 1: Well 4 Motor Name Plate <br />b. Exhibit 2: Pump Installation Report 2004 <br />c. Exhibit 3: Well 4 Lithology Report <br />2. The CONTRACTOR is responsible for estimating dimensions and quantities of materials.