My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Curb & Sidewalk Repair Proj No. 120-001A - TX Concrete, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening of Quotes - Curb & Sidewalk Repair Proj No. 120-001A - TX Concrete, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2020 6:52:19 PM
Creation date
11/24/2020 6:49:57 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/24/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Version 2/14/2020 Page - 8 Public Works Quote <br /> <br /> <br />3. Where specified the Concrete Curb type shall be a “Modified Combination Curb” per the City of <br />South Bend Standards, Sheet 2-35. The pavement patch shall match the existing street material <br />whether it be asphalt, concrete, or asphalt over concrete. The depth of the pavement patch shall <br />be a minimum of 8 inches or the same depth as the original pavement, whichever is greater. In the <br />case of asphalt over the concrete pavement, the minimum concrete thickness shall be 6 inches <br />and the asphalt thickness shall match existing. Removal and replacement of existing pavement <br />shall not be paid for separately, but included in the cost of the CONCRETE CURB, MODIFIED <br />item. <br />4. Expansion material is required at all cold joints and every 80 ft. <br />5. Control joints are to be placed at equal intervals not exceeding 10 ft. <br />6. In locations where new curb is designated to match existing curb, the new curb height may be <br />adjusted during the last five (5) feet to match the existing curb profile. <br />7. The Contractor shall ensure that adequate drainage exists once new concrete curbs are installed. <br />The Contractor shall ensure that low spots do not exist and that water can flow to existing inlets <br />similar to pre-existing conditions. <br />a. The Contractor shall provide an asphalt patch that extends 22” from the face of curb to ensure <br />adequate drainage” per the City of South Bend Standards, Sheet 2-35. Within patch area, <br />asphalt shall be milled to a depth of 1.5” below the top of existing pavement. Patch shall be <br />constructed to achieve drainage to existing inlets similar to pre-existing conditions. Removal <br />and replacement of existing pavement shall not be paid for separately, but included in the cost <br />of the concrete curb. <br />8. If tree roots are encountered and must be removed due to grades, the contractor shall contact a <br />representative from the City of South Bend Engineering Division. Tree roots shall not be removed <br />without the on-site approval of the Engineer. The cost of root removal shall not be paid for <br />separately but shall be included on the cost of other items. <br />9. Payment shall be made at the Unit Price specified in the Proposal as follows: <br />CONCRETE CURB, MODIFIED………………. LF <br /> <br />XXVIII. CONCRETE CURB RAMP, REMOVE <br />A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 202 <br />B. Additions: <br /> <br />1. The pay item CONCRETE CURB RAMP, REMOVE, shall include the removal of all sidewalk, curb, <br />curb ramps, grass, subgrade, and any other materials within the areas designated for new curb <br />ramps in the plans. <br />2. Precise removal limits shall be coordinated with the Engineer prior to starting work at each location. <br />The Contractor shall dispose of the removed sidewalk at an offsite disposal site properly licensed <br />to receive such material. Removed material shall not be stockpiled at the work location and shall <br />be disposed daily. The cost of hauling of materials offsite shall not be paid for separately, but <br />included in the cost of concrete curb ramp removal. The Contractor shall be responsible for <br />preventing any removed materials from entering any storm drains. <br />3. Concrete or other items outside the removal limits damaged by the Contractor or any <br />subcontractors during the removal process will be repaired or replaced to the satisfaction of the <br />Engineer at no additional cost. <br />4. Saw cuts required for removal shall not be paid for separately, but included in the cost of the curb <br />ramp removal. <br />5. Payment shall be made at the Unit Price specified in the Proposal as follows: <br />CONCRETE CURB RAMP, REMOVE ……….….SY <br /> <br />XXIX. CONCRETE CURB RAMP <br />A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 604 <br />B. Additions: <br /> <br />1. The pay item CONCRETE CURB RAMP shall include constructing new ADA compliant curb ramps <br />in accordance with the Americans with Disabilities Act (ADA) guidelines, the United States Access <br />Board Public Right-Of-Way Accessibility Guidelines (PROWAG), the South Bend Construction <br />Standards and Specifications, and the special provisions herein.
The URL can be used to link to this page
Your browser does not support the video tag.