My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Cleveland Well Nos. 2 & 3 Refurbishments Proj No. 118-021E - Peerless Midwest, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening of Quotes - Cleveland Well Nos. 2 & 3 Refurbishments Proj No. 118-021E - Peerless Midwest, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2020 6:48:22 PM
Creation date
11/24/2020 6:47:22 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/24/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Version 4/2/2019 Page - 10 Public Works Quote <br />b.Inspect all boxes, crates, and packages upon delivery to Site and notify ENGINEER in writing <br />of loss or damage to products. Promptly remedy loss and damage to new condition per <br />manufacturer’s instructions. <br />c.Keep all products off ground using pallets, platforms, or other supports. Protect steel, packaged <br />materials, and electronics from corrosion and deterioration. <br />5.Warranty: <br />a.Provide manufacturer’s written warranty, running to the benefit of the OWNER, agreeing to <br />correct, at OWNER’s option, remove, or replace materials or equipment specified in this section <br />and found to be defective for a period of three years after date of final completion. <br />6.Design Conditions: <br />Design Condition Well No. 3 <br />Make U.S. <br />Motor Size (hp) and Maximum <br />Speed (rpm) <br />100 hp <br />1800 rpm <br />Motor Voltage/Phase/Hertz 440/3/60 <br />Frame 444UP <br />Note: Design conditions correspond to existing motor nameplate information. Refer to Exhibit 4 for <br />details. <br />7.Proposed substituted item specifications must be submitted to the Owner and Engineer a minimum <br />of seven (7) days prior to bid opening date. The City of South Bend will determine if substitute <br />product is equal in quality and intent and will issue a statement to the Bidder. <br />III.PLANS <br />A. Prevailing Specifications: City of South Bend Design and Construction Standards <br />B. Additions: <br />1. Attachments: <br />a.Exhibit 1: Well 3 Pump Curve <br />b.Exhibit 2: Well 3 Pump Installation Report 2004 & 2009 <br />c.Exhibit 3: Well 3 Lithology and Pump Service Report 2004 <br />d.Exhibit 4: Well 3 Motor Name Plate <br />e.Exhibit 5: Well 2 Pump Curve <br />f. Exhibit 6: Well 2 Pump Installation Report <br />g.Exhibit 7: Well 2 Lithology Report <br />2. The CONTRACTOR is responsible for estimating dimensions and quantities of materials.
The URL can be used to link to this page
Your browser does not support the video tag.