Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: Seitz Park Reconstruction <br />Project Number: 117-093A <br />For Bids Due: November 24, 2020 <br />Contractor Name: Larson-Danielson Construction Co., Inc. <br />C-52 Foundation, Lighting 11 EACH $1,415.28 $15,568.08 <br />C-53 Luminaire, Type L1 9 EACH $4,187.95 $37,691.55 <br />C-54 Luminaire, Type L1B 2 EACH $4,240.97 $8,481.94 <br />C-55 Luminaire, Type L5 3 EACH $1,148.20 $3,444.60 <br />C-56 Luminaire, Type L7 3 EACH $995.11 $2,985.33 <br />C-57 Luminaire, Type L11 2 EACH $727.37 $1,454.74 <br />C-58 Handhole, Lighting 9 EACH $1,022.96 $9,206.64 <br />C-59 Schedule 80 HDPE, 0.75 inch 150 LFT $6.11 $916.50 <br />C-60 Schedule 80 HDPE, 1.5 inch 425 LFT $7.19 $3,055.75 <br />C-61 Schedule 80 HDPE, 2 inch 400 LFT $7.89 $3,156.00 <br />C-62 Wire, 3#6, No 6 AWG, Stranded Copper 300 LFT $6.90 $2,070.00 <br />C-63 Wire, 3#8, No 8 AWG, Stranded Copper 825 LFT $5.03 $4,149.75 <br />C-64 Wire, 2#12, No 12AWG, Solid Copper 150 LFT $2.27 $340.50 <br />C-65 Forest Light Reinstallation 1 LSUM $13,633.04 $13,633.04 <br />C-66 Forest Light Donor Recognition Sign 1 LSUM $1,264.07 $1,264.07 <br />C-67 Pedestal Receptacle, Exterio 7 EACH $1,779.18 $12,454.26 <br />C-68 Excelsoir Blanket 45 SYS $26.33 $1,184.85 <br />C-69 Shredded Hardwood Mulch 15 CYS $79.00 $1,185.00 <br />C-70 Deciduous Tree, 2.5 inch Caliper 8 EACH $579.37 $4,634.96 <br />C-71 Shrubs, No. 3 Cont.68 EACH $49.51 $3,366.68 <br />C-72 Perennials, No. 1 Cont.302 EACH $13.17 $3,977.34 <br />C-73 Ornamental Grasses, No. 1 Cont. 39 EACH $18.96 $739.44 <br />C-74 Planting Mixture 80 CYS $79.00 $6,320.00 <br />C-75 Irrigation System 1 LSUM $46,560.06 $46,560.06 <br />DIVISION C TOTAL $1,439,622.51 <br />DIVISION D - BASE BID <br />Item <br />No. Line Item Quantity Unit Unit Price Total Amount <br />D-1 Remediation Allowance 1 LSUM $5,000.00 $5,000.00 <br />D-2 Maintenance of Traffic 1 LSUM $5,465.38 $5,465.38 <br />D-3 Permit Compliance Administration 1 LSUM $2,500.00 $2,500.00 <br />D-4 Mobilization and Demobilization 1 LSUM $126,667.45 $126,667.45 <br />Version 4/2/2019 Contractor's Bid for Public Works - 7