Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: Seitz Park Reconstruction <br />Project Number: 117-093A <br />For Bids Due: November 24, 2020 <br />Contractor Name: Larson-Danielson Construction Co., Inc. <br />C-22 Concrete, C, Superstructure 68 CYS $1,067.55 $72,593.40 <br />C-23 Concrete, A, Planter Wall 144 CYS $1,472.99 $212,110.56 <br />C-24 Concrete Topping Slab, Integral Color, Finish "A" 100 SYS $214.67 $21,467.00 <br />C-25 Concrete Topping Slab, Integral Color, Finish "B" 144 SYS $49.38 $7,110.72 <br />C-26 Subgrade Treatment, Type III 687 SYS $5.27 $3,620.49 <br />C-27 Compacted Aggregate, No. 53 660 TON $63.20 $41,712.00 <br />C-28 Sidewalk, 6-in 224 SYS $92.46 $20,711.04 <br />C-29 Sidewalk, 6-in, Integral Color, Finish "A" 690 SYS $117.02 $80,743.80 <br />C-30 Sidewalk, 6-in, Integral Color, Finish "B" 583 SYS $99.25 $57,862.75 <br />C-31 Sidewalk, 8-in, Integral Color, Finish "A" 269 SYS $123.64 $33,259.16 <br />C-32 Sidewalk, 8-in, Integral Color, Finish "B" 194 SYS $108.92 $21,130.48 <br />C-33 Straight Curb 42 LFT $41.29 $1,734.18 <br />C-34 Concrete Walk False Joints 795 LFT $2.25 $1,788.75 <br />C-35 Expansion Joint, Concrete Walk 203 LFT $6.48 $1,315.44 <br />C-36 Sidewalk Joint Transitions 62 LFT $10.71 $664.02 <br />C-37 Unit Paver 259 SYS $281.45 $72,895.55 <br />C-38 Unit Paver Custom Engraving 403 EACH $47.19 $19,017.57 <br />C-39 Litter Receptacle 2 EACH $1,260.19 $2,520.38 <br />C-40 Recycling Receptacle 2 EACH $1,260.19 $2,520.38 <br />C-41 Type 5 Rail with Custom Infill Panel, 42 inch 368 LFT $331.82 $122,109.76 <br />C-42 Type 5 Rail with Custom Infill Panel, Custom Curved, 42 <br />inch 45 LFT $376.52 $16,943.40 <br />C-43 Type 5 Rail with Custom Infill Panel, 48 inch 408 LFT $352.89 $143,979.12 <br />C-44 Type 5 Rail with Custom Infill Panel, Custom Curved, 48 <br />inch 114 LFT $384.49 $43,831.86 <br />C-45 Type 5 Rail Swing Gate 5 EACH $654.16 $3,270.80 <br />C-46 Handrail 6 LFT $421.36 $2,528.16 <br />C-47 Flagpole 1 EACH $820.17 $820.17 <br />C-48 Memorial, Salvaged, Reinstallation 1 EACH $5,121.11 $5,121.11 <br />C-49 Bollard, Steel, Removable, with Foundation 3 EACH $1,571.46 $4,714.38 <br />C-50 Belt Barrier 1 LSUM $182.36 $182.36 <br />C-51 Lighting, Pole, 12 ft 11 EACH $5,310.74 $58,418.14 <br />Version 4/2/2019 Contractor's Bid for Public Works - 6