My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Encroachment & Revocable Permit - Eddy St. Commons Phase II - Kite Realty Group
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Licenses & Permits
>
Encroachment & Revocable Permit - Eddy St. Commons Phase II - Kite Realty Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 10:56:56 AM
Creation date
11/12/2020 11:32:58 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Permit Applications
Document Date
11/10/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br />K/TE <br />REALTY GROUP <br />30 S. Meridian Street, Suite 1100 <br />Indianapolis, IN 46204 <br />317-577-5600 <br />FAX 317-577-5605 <br />kiterealty.com <br />Therefore, Kite Realty Group would like to formally request approval from the Board of <br />Public Works for the following encroachments into City of South Bend R/W. Please <br />find attached with this letter a site plan visually showing these encroachments. <br />Storm Sewer Encroachment #1 <br />• Occurs along the north side of Saint Vincent Street from the alley midway <br />between Eddy Street and Frances Street to the east side of Eddy Street. <br />• The storm sewer is 9' into the Saint Vincent Street R/W for a distance of 215 feet. <br />• The encroachment carries stormwater from Building "A" to an underground <br />detention system in the parking lot behind Building `B". <br />Storm Sewer Encroachment #2 <br />• Occurs in the midblock alley between Eddy Street and Frances Street. <br />• The storm sewer runs along the R/W line, and the pipe encroaches l' into the <br />R/W for a distance of 410 to the north edge of Howard Street. <br />• There are 4 manholes along this distance that encroach into the alley R/W <br />approximately 2'. <br />• The encroachment carries stormwater from Building "C" to an underground <br />detention system in the Robinson Center parking lot. <br />Storm Sewer Encroachment #3 <br />• Occurs on the north side of Howard Street south of Building C. <br />• The encroachment length is approximately 92' and the distance varies. The <br />maximum encroachment distance is 11', and the entirety of the encroachment is <br />outside the limits of pavement. <br />• The encroachment carries stormwater from Building "C" to an underground <br />detention system in the Robinson Center parking lot. <br />Page 2 of 3 K <br />RG <br />NYSE <br />
The URL can be used to link to this page
Your browser does not support the video tag.