My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ratify RFQ Selection - Pinhook Water Treatment Plant Improvements Proj No. 119-003 - Bowen Engineering Corporation
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Award Quotations/Proposals
>
Ratify RFQ Selection - Pinhook Water Treatment Plant Improvements Proj No. 119-003 - Bowen Engineering Corporation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 11:22:55 AM
Creation date
11/12/2020 11:22:52 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/10/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Area Percentage Score Bowen FA Wilhelm Kokosing Reynolds <br />Background and Qualifications 5% 0 - 5 5.0 4.0 4.5 3.5 <br />1. Qualified under Indiana Code <br />2. Company history overall/Indiana <br />3. Qualifications of personnel assigned to project <br />4. Services provided by provider <br />References 20% 0 - 20 19.3 9.0 15.0 14.0 <br />1. Guaranteed savings contracts in Indiana <br />2. Personnel involved <br />3. Indiana water/sewer GSC completed <br />Technical Approach 25% 0 - 25 21.0 18.7 22.7 23.0 <br />1. Responder understanding of scope <br />2. History of working under defined shut-down <br />3. Team water treatment experience <br />4. How has team collaborated with engineers <br />5. Value engineering history/implementation <br />Project Implementation 20% 0 - 20 19.0 16.2 16.4 17.5 <br />1. Demonstration of performance of 30% of value <br />2. Project Manager resume/history <br />3. Project Management plan <br />4. Communication plan <br />5. General Contractor ability/experience water <br />6. Identified Sub-Contractor experience <br />Financial Approach 20% 0 - 20 19.0 15.8 19.3 17.0 <br />1. Management of phased implementation <br />2. Description of procurement plan <br />3. History with adherence to GMP <br />4. Open book policy/procedures <br />5. Bonding capacity <br />Guarantee Management 10% 0 - 10 10.0 8.8 9.6 8.5 <br />1. Procedure for guarantee management <br />2. Does procedure meet Indiana Code <br />3. Methodology for baseline energy calculation <br />4. Guarantee management cost, schedule, report <br />5. Description of savings estimate methodology <br />6. O&M estimate description and savings <br />7. Future capital savings estimate and incorporation <br />Total 100% 100 93.3 72.5 87.5 83.5 <br />CITY OF SOUTH BEND, INDIANA <br />PINHOOK WTP IMPROVEMENTS PROJECT <br />GUARANTEED SAVINGS CONTRACT <br />STATEMENT OF QUALIFICATIONS EVALUATION <br />SELECTION COMMITTEE SCORE SHEET
The URL can be used to link to this page
Your browser does not support the video tag.