Laserfiche WebLink
9 <br /> Page #: 50 <br /> <br />Header: 22.7 Oxygen Bottle Storage, 22.8.1 Additional Oxygen Bottle Storage <br /> <br />Exception: PL Custom offers as a standard a recessed (2) bottle storage area next <br />to the side entry door stepwell along with strapless, crash tested and approved <br />Zico bottle holders. (2) Zico Strapless Oxygen Bottle Holders will be provided in <br />the exterior oxygen compartment for a total of (4) portable oxygen bottles being <br />carried and secured in the ambulance. <br /> <br />Page #: 50 <br /> <br />Header: 22.9, 22.9.1 and 22.9.2 Squad Bench Cabinet <br /> <br />Exception: Lexan with be provided vs. the specified Plexiglas and will be <br />provided as a sliding Lexan with lift up restocking feature. <br /> <br />Page #: 50 <br /> <br />Header: 23.0 IV Holders <br /> <br />Exception: Due to the location that PL Custom locates and mounts their recessed, <br />ceiling mounted IV holders only (2) are provided. <br /> <br />Page #: 53, 54 <br /> <br />Header: 25.0 Module Surface Preparation, 25.1 Paint, 25.2 Body Color, 25.3 Roof <br /> Paint Color <br /> <br />Exception: PL Custom provides a paint process that is organized and closely <br />monitored by Akzo Nobel Sikkens Paint Systems. PL provides with their paint <br />process an industry leading 10 year warranty with corrosion warranty for a <br />superior product and finish. See our proposal Vehicle Painting pages 53, 54, 55, <br />56, 57for a very in depth description of our paint process and Paint Warranty <br />document in the Warranty section of our Bid proposal. <br /> <br />Page #: 55 <br /> <br />Header: 26.1 Operation Instructions <br /> <br />Exception: All Operating Instructions are detailed hard copy included in the <br />Owners Manuel. <br /> <br />Page #: 56 <br /> <br />Header: 26.2 Electrical Schematics CD