Laserfiche WebLink
REGULAR MEETING <br />OCTOBER 13, 2020 179 <br />:I <br />Description <br />Year/Make/Model <br />I Unit Price <br />Pick Up Truck <br />2021 Ford F250 4x4 Re ular Cab <br />1 $29,769.00 Each <br />Alternate # <br />Description <br />Cost <br />Total <br />1 <br />Front mounted western 8' pro -plus power <br />$6,050.00 <br />$6,050.00 Each <br />angling left and right. Plow to come <br />equipped with safety approved lights and <br />markers, and snow deflector. <br />2 <br />Front mounted western MVP Plus. Plow <br />$6,530.00 <br />$6,530.00 Each <br />to come equipped with safety approved <br />lights, markers, and snow deflector and <br />shoes. <br />3 <br />Roof mounted lightbar with controller, <br />$3,125.00 <br />$3,125.00 Each <br />Federal Signal 53' Legend LPX or equal. <br />Note: Price <br />includes four <br />corner strobes <br />4 <br />Tommy Gate Steel Deck lift gate orequal <br />$4,494.00 <br />$4,494.00 Each <br />5 <br />CNG — Bi-fuel conversion with tanks <br />$12,905.00 <br />$12,905.00 <br />mounted under bed. <br />6 <br />CNG — Dedicated <br />$14,205.00 <br />$14,205.00 <br />Each <br />Estimated number of days for delivery from Truck 14 Weeks Plus W A Jones, Plus A-1 If <br />award date Applicable <br />Upon a motion made by Ms. Maradik, seconded by Mr. Molnar and carried by roll call, the <br />above bid was referred to Central Services for review and recommendation. <br />OPENING OF QUOTATIONS — MAIN AND JEFFERSON SITE IMPROVEMENTS - <br />LANDSCAPING —PROJECT NO. 119-022C (PR-00004033) <br />Mr. Gilot advised that this was the date set for the receiving and opening of sealed Quotations for <br />the above referenced project. The following quotation was opened and read: <br />WEIGAND CONSTRUCTION CO., INC. <br />7808 Honeywell Dr. <br />Fort Wayne, IN 46825 <br />dgarman a weigandconstruction.com <br />Quotation was submitted by Mr. Jeremy Ringger <br />Non -Collusion, Non -Discrimination Affidavit Form was completed <br />QUOTATION: $29,380.00 <br />Upon a motion made by Ms. Maradik, seconded by Mr. Molnar and carried, the above quotation <br />was referred to Community Investment and Engineering, for review and recommendation. After <br />reviewing the quotation, Mr. Zach Hurst, Engineering, stated the quotation could not be awarded <br />today due to missing quote documents. <br />OPENING OF REOUEST FOR OUALIFICATIONS — SOUTH BEND PINHOOK WATER <br />TREATMENT PLANT GUARANTEED SAVINGS CONTRACT (PR-00002793) <br />This was the date set for receiving and opening of sealed Qualifications for the above referenced <br />project. The Clerk tendered proof of publication of Notice in the South Bend Tribune, which was <br />found to be sufficient. The names of the following companies submitting qualifications were <br />opened and publicly read: <br />REYNOLDS CONSTRUCTION <br />1119 Keystone Way, Suite 201 <br />Carmel, IN 46032 <br />KOKOSING INDUSTRL&L <br />3862 N. Commercial Pkwy. <br />Greenfield, IN 46140 <br />