My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Design, Bid, & Construction Services for North WTP Improv. Proj No. 119-011 - Black & Veatch
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Design, Bid, & Construction Services for North WTP Improv. Proj No. 119-011 - Black & Veatch
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 3:35:09 PM
Creation date
10/27/2020 3:34:46 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/27/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 6 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />Engineer will review shop drawings and other data submitted by the Contractor as required by <br />the Construction Contract Documents. The Engineer's review shall be for general conformity to <br />the Construction Contract Documents for the project and shall not relieve the Contractor of any <br />of his contractual responsibilities. Such reviews shall not extend to means, methods, <br />techniques, sequences, or procedures of construction or to safety precautions and programs <br />incident thereto. The Scope of Services is based on review of up to 10 submittals or re- <br />submittals. Additional submittal reviews can be provided as a supplemental service. Engineer <br />will also receive and review certificates of inspection, tests, and approvals which are to be <br />assembled by the Contractor in accordance with the construction Contract Documents and <br />transmit them to the Owner. <br />Review of “Substitutes” requests by the Contractor shall follow the requirements of the General <br />Conditions in the Contract Documents. The Engineer will perform such reviews as a <br />supplemental service and will track the time and expenses separately for payment. <br />Task 205 – Site Visits <br />Engineer will make periodic visits to the construction site when requested by the Owner to <br />observe construction and confer with the Owner or Contractor concerning problems and/or <br />progress of the Work. The scope is based on three (3) trips for either the engineering manager <br />or the process engineer to review design-related questions and construction conflict or issue <br />resolution. Additional trips may be provided as a supplemental service. <br />The Engineer shall not have responsibility for the superintendence of construction site <br />conditions, safety, safe practices or unsafe practices or conditions, operation, equipment, or <br />personnel other than employees of the Engineer. This service will in no way relieve the <br />Contractor of complete supervision of the Work or the Contractor’s obligation for complete <br />compliance to the Contract Documents. The Contractor shall have sole responsibility for safety <br />and for maintaining safe practices and avoiding unsafe practices or conditions. <br />Task 206 – Final Inspection <br />Upon substantial completion, Engineer will conduct an inspection of the project site and <br />prepare a punchlist of items to be completed or corrected by the Contractor before final <br />completion of the project. Engineer will submit results of the inspection to the Owner and <br />Contractor. Upon completion or correction of the items of work on the punch list, Engineer <br />will conduct one final inspection to determine if the work is completed and provide written <br />recommendations to the Owner concerning final payment including a list of items, if any, to be <br />completed prior to the making of such payment. The inspection will be conducted by the <br />engineering manager. <br />Task 207 – Revise Construction Contract Drawings <br />Upon completion of the project, Engineer will revise the construction contract drawings to <br />conform to the construction records. Revisions to the construction contract drawings will be <br />provided by the Contractor for editing by the Engineer. An electronic copy in AutoCAD and <br />PDF formats of the conformed-to-construction drawings will be provided to the Owner.
The URL can be used to link to this page
Your browser does not support the video tag.