My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Design, Bid, & Construction Services for North WTP Improv. Proj No. 119-011 - Black & Veatch
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Design, Bid, & Construction Services for North WTP Improv. Proj No. 119-011 - Black & Veatch
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 3:35:09 PM
Creation date
10/27/2020 3:34:46 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/27/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Page 3 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />Mechanical Process <br />• Mechanical Process Abbreviations, Legends and General Notes <br />• Mechanical Process Filter Area Demolition Plan <br />• Mechanical Process Filter Area Plan <br />• Mechanical Process Filter Area Sections <br />• Mechanical Process Details <br />Contract Documents will be reviewed by senior engineers for quality assurance. The review <br />will cover conformance to standards, completeness, adherence to sound engineering practices, <br />and constructability. <br />Deliverables for the project include: <br />Basis of Design Memorandum / 30 Percent Design Deliverable <br />• Draft Basis of Design Memorandum <br />• Preliminary Construction Sequencing Plan <br />• Civil Site Plan <br />• Mechanical Process Plan, Section and Details <br />• Specifications Table of Contents <br />• Preliminary Opinion of Probable Construction Cost <br />90 Percent Design Deliverable <br />• Final Basis of Design Memorandum <br />• Construction Sequencing Plan <br />• Civil Site Plan <br />• Mechanical Process Plan, Section and Details <br />• Front end and technical specifications including filter media, filter vessel inspection and <br />repairs, and piping. <br />A PDF set of drawings and specifications will be provided to the Owner at approximately 30 <br />and 90 percent completion milestones for review and comment. The Owner will provide <br />comments to the Engineer within ten days of receipt of the drawings and specifications. Three
The URL can be used to link to this page
Your browser does not support the video tag.