My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10012020 Board of Public Works Special Meeting
sbend
>
Public
>
Public Works
>
Minutes
>
2020
>
10012020 Board of Public Works Special Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 1:15:09 PM
Creation date
10/19/2020 9:22:34 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
10/1/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SPECIAL MEETING <br />OCTOBER 1, 2020 173 <br />LARSON-DANIELSON CONSTRUCTION CO., INC. <br />302 Tyler St. <br />LaPorte, IN 46350 <br />jaw@ldconstruction.com <br />Bid was submitted by Mr. Timothy F. Larson <br />Non -Collusion, Non -Discrimination Affidavit Form was completed <br />Five percent (5%) Bid Bond was submitted <br />ON <br />Base Bid $442,971.00 <br />Alternates <br />Base Bid Plus Alternates $442,971.00 <br />Upon a motion made by Ms. Maradik, seconded by Mr. Molnar and carried by roll call, the <br />above bids were referred to Venues, Parks, and Arts, and Engineering for review and <br />recommendation. <br />OPENING OF QUOTATION — NOTRE DAME TRIANGLE ALLEY PAVING — PROJECT <br />NO. 119-057R (PR-00004021) <br />The following sealed quotation received on September 22, 2020, for the above referenced project <br />was opened and publicly read: <br />RIETH-RILEY CONSTRUCTION CO., INC. <br />25200 State Road 23 <br />South Bend, IN 46614 <br />hgritton@Zneth-riley.com <br />Quotation was submitted by Ms. Hannah J. Gritton <br />Non -Collusion, Non -Discrimination Affidavit Form was completed <br />OUOTATION: <br />Base Quote <br />$39,847.00 <br />Voluntary Alternate #1 <br />$9,285.50 <br />Base Quote Plus Voluntary Alternate <br />$49,132.50 <br />Upon a motion made by Ms. Maradik, seconded by Mr. Molnar and carried by roll call, the <br />above quotation was referred to Engineering for review and recommendation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.