BID TABULATION
<br />O'Brien Recreation Renovation
<br />Project No: 118-091
<br />For Bids Due: September 22, 2020
<br />Larson-Danielson Construction
<br />Engineer's EstimateZiolkowski ConstructionBrown & BrownGibson-Lewis, LLCR. Yoder Construction, Inc.
<br />Co., Inc.
<br />Alternate H
<br />Item No.DescriptionQuantityUnitUnit PriceItem TotalUnit PriceItem TotalUnit PriceItem TotalUnit PriceItem TotalUnit PriceItem TotalUnit PriceItem Total
<br />Deduct amount to the base bid to eliminate the removal of the cross
<br />11LS$ - $ (1,100.00) $ (1,100.00)$ (900.00) $ (900.00)$ (8,000.00) $ (8,000.00)$ (1,537.00) $ (1,537.00)$
<br /> (4,000.00) $ (4,000.00)
<br />corridor doors, frame and wall at the junction of the main level south and
<br />east corridor doors
<br />ALTERNATE H TOTAL$ - $ (1,100.00) $ (900.00) $ (8,000.00) $ (1,537.00)$ (4,000.00)
<br />Larson-Danielson Construction
<br />Engineer's EstimateZiolkowski ConstructionBrown & BrownGibson-Lewis, LLCR. Yoder Construction, Inc.
<br />Co., Inc.
<br />Alternate I
<br />Unit PriceUnit PriceUnit PriceUnit PriceUnit PriceUnit Price
<br />Item No.DescriptionQuantityUnitItem TotalItem TotalItem TotalItem TotalItem TotalItem Total
<br />Deduct amount to the base bid to not install new lockers in the new main
<br />11LS$ - $ (20,000.00) $ (20,000.00)$ (27,200.00) $ (27,200.00)$ (30,600.00) $ (30,600.00)$ (28,060.00) $ (28,060.00)$ (24,250.00)$
<br /> (24,250.00)
<br />level locker rooms
<br />ALTERNATE I TOTAL$ - $ (20,000.00) $ (27,200.00) $ (30,600.00) $ (28,060.00) $ (24,250.00)
<br />$ 497,000.00 $ 425,200.00 $ 499,600.00 $ 442,971.00 $
<br /> 388,100.00
<br />BASE BID TOTAL
<br />ALTERNATES A THROUGH I TOTAL$ 42,000.00 $ 65,100.00 $ 34,400.00 $
<br /> 64,383.00 $ 76,825.00
<br />BASE BID AND ALTERNATES C (fitness flooring), E (metal toilet partitions), F (eliminate tile
<br />$ 519,000.00 $ 448,500.00 $ 504,800.00 $ 462,789.00 $
<br /> 415,605.00
<br />wainscoat), H (eliminate removal of cross corridor doors), AND I (no new lockers) TOTAL
<br />BASE BID AND ALTERNATES A (family restroom), B (check-in desk), E (metal toilet partitions), F
<br />$ 490,000.00 $ 421,200.00 $ 475,400.00 $ 428,565.00 $
<br /> 384,530.00
<br />(eliminate tile wainscoat), H (eliminate removal of cross corridor doors), AND I (no new lockers)
<br />TOTAL
<br />$ 548,000.00 $ 475,400.00 $ 536,900.00 $ 495,314.00 $
<br /> 434,075.00
<br />BASE BID AND ALTERNATES A (family restroom), B (check-in desk), AND I (no new lockers)
<br />BASE BID AND ALTERNATES A (family restroom), F (eliminate tile wainscoat), AND I (no new
<br />$ 493,000.00 $ 423,400.00 $ 486,900.00 $ 433,379.00 $
<br /> 390,675.00
<br />lockers) TOTAL
<br />BASE BID AND ALTERNATES B (check-in desk), F (eliminate tile wainscoat), AND I (no new
<br />$ 494,000.00 $ 430,000.00 $ 485,600.00 $ 444,900.00 $
<br /> 389,250.00
<br />lockers) TOTAL
<br />YYYN - Missing 3 and 4Y
<br />Addenda
<br />YYYYY
<br />Bid Bond
<br />YYYY
<br />Y
<br />WBE/MBE Form
<br />YY - Missing Sheet 1.0YYY
<br />Non-Collusion Affadavit
<br />Responsible BidderN - Missing DOL LetterYYN - Missing DOL Letter and CertY
<br />I hereby certify that the above truly and accurately represents bids received for this project on September 22, 2020
<br />William Hentschel, Forum Architects, LLC
<br />Page 2 of 2