My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening Request for Qualifications - SB Pinhook WTP Guaranteed Savings Contract - Reynolds Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening Request for Qualifications - SB Pinhook WTP Guaranteed Savings Contract - Reynolds Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2020 1:08:04 PM
Creation date
10/14/2020 1:07:51 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/13/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXECUTIVE SUMMARY <br />CITY OF SOUTH BEND: PINHOOK WTP IMPROVEMENTS PROJECT GUARANTEED SAVINGS CONTRACT <br />EXECUTIVE SUMMARY <br />INTRODUCTION <br />Reynolds Construction is honored to be considered a partner for this important project at the Pinhook Water Treatment <br />Plant. Our team appreciates being invited to participate in this opportunity and we feel the decision-making committee <br />will witness that our approach is more comprehensive, cost effective and will fulfill more of the long-term needs of the <br />plant. The focus of Reynolds Construction is to maximize the amount of work that can be completed during the defined <br />operational shut-down period to avoid additional shutdowns which may be associated with a phasing approach. <br />Our team is offering 2 separate options for completing the work required at the plant. The first option meets the intent <br />of the RFQ and includes the stated scope of work in the solicitation. The second option offers a structure to increase <br />the scope of work and include additional items which have been identified and will be required in the future. It is <br />anticipated by both the staff of the plant and representatives of American Structurepoint that the Pinhook plant will <br />need to be taken out of service for a period of time to complete the work identified on the priority list. Our second option <br />offers a project structure which accelerates the schedule, takes advantage of the shutdown period, and completes a <br />more comprehensive scope of work at the plant. <br />As mentioned during the walk thru, the identified scope of work for this project is being driven by the budget which was <br />stated to be approximately $1.2M. This estimate could grow or be reduced once our team shuts down the plant and <br />the unforeseen conditions are exposed. Based on our history with projects like this one, we anticipate the scope will <br />be reduced which will provide more funding for other scope items to be completed. However, we do not think the <br />additional funds will be enough to afford the total improvements required for the plant. The basis of design identifies <br />improvements for the entire plant to be closer to $3M to $3.5M. <br />In an effort to accomplish a more comprehensive modernization plan, Reynolds is proposing funding this project <br />utilizing an alternative tax-exempt financing structure Since the financial markets are offering long term tax-exempt <br />financing structures at historically low interest rates, the ity should seriously consider this option. This structure <br />will allow the City to complete a more comprehensive project now, avoid multiple phases of work <br /> shutdowns and spread the costs out over time. <br />Our proposed financing structure includes the following. <br />Fixed tax-exempt rate range 2% 2.7%6.The City will not make a payment until receiving <br />No down payments or reserves requiredbeneficial use of the plant improvements, which is <br />Non-appropriated structure, not consideredscheduled for August 2021. <br />constitutional debt7.Funds are immediately available at closing <br />Financing term aligns with the life of the new assets <br />Lower issuance costs than traditional financing <br />methods <br />The request for Qualifications states the City may implement the capital improvements in several phases over a three <br />(3)to five (5) year period. If the City has identified funding sources for future work, then a more in-depth discussion <br />about utilizing alternative financing would prove to be beneficial. Reynolds Construction offers this alternative funding <br />plan so a phased in approach can be avoided. <br />The Reynolds team has developed preliminary strategies to assist in reducing the investment required for this <br />rehabilitation work while maintaining the highest standard of quality. Reynolds is proposing a fixed fee agreement set <br />at 8%. The design documents estimate a 15% overhead and profit for construction, this reduction of fees is an indication <br />of our commitment to bring this project in at the highest quality standards and under budget. <br />Reynolds Construction has completed more than 70 Alternative Delivery projects over the past several years with a <br />total value of more than $800 Million. Our construction team, one of the largest in the state, has over 75 years of <br />experience specializing in progressive design-build construction in the water and wastewater industry. Doug Tischbein, <br />manager of GSC services for Reynolds, has over 30 years of experience completing projects under the GSC statute. <br />Page | 4 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.