Laserfiche WebLink
\[źƭƷƚŅ‘ğƷĻƩΉ‘ğƭƷĻǞğƷĻƩ9ǣƦĻƩźĻƓĭĻƚŅƚǒƩĻğƒΛYĻǤtĻƩƭƚƓƓĻƌΜ <br />hǝĻƩƷŷĻ\[ğƭƷЊЉ—ĻğƩƭ <br />CurrentorActualFinalorCurrentProjectProjectProjectContract <br />EngineerDescription <br />ProjectNameCityST <br />CompletionDateContractAmountExecutiveManagerSuperintendentDelivery <br />HickoryRunEnergy(HRE)isconstructinganominal1,000MW <br />combinedcycleelectricgeneratingfacility(powerplant)inNorth <br />BeaverTownship,LawrenceCounty,Pennsylvania.HickoryRun <br />MikeBenter <br />HickoryRunEnergyWaterDesignBuild/ <br />NewCastlePA6/30/2019O'Brien&Gere$12,846,414PaulBurtonRandyRickButcherEnergycontractedwithNewCastleSanitationAuthority(NCSA)to <br />InfrastuctureEPC <br />Tummersprovidereclaimedwaterfromwastewatertreatmentplant <br />atarateof2,500gpmto5,000gpmtosupporttheoperationofthe <br />powerplant. <br />Theprojectconsistedofconstructionofanewwatertreatment,and <br />CMAR(Target <br />ParkvilleWTPParkvilleMO6/15/2018Black&Veatch$20,694,969PaulBurtonAdamRalphRickButcherdecommissioningofanexistingwatertreatmentplantandtheuse <br />Cost) <br />ofvalves. <br />Upgradeoftheexistingwastewatertreatmentplantincluding:new <br />headworksstructurewithonemechanicalscreenandbypassbar <br />screen,screeningswashercompactor,andfourrawsewagepumps;a <br />newgritremovalsystemwithtwovortexgrittanksandagrit <br />classifierinanewbuilding;newbiologicalselectorsystemwithan <br />anaerobicbasin,phaseseparatortank,andpreanoxictank;twonew <br />stagedaerationreactors;onenewsecondaryclarifierand <br />rehabilitationoftwoexistingclarifiers;anewreturnactivatedsludge <br />MonticelloWWTPImprovementsMonticelloIN11/30/2017WesslerEngineering$11,439,964PaulBurtonDaleFleenorBudLandstromLSBpumpstation;twonewmechanicalclothmediafiltersinstalledin <br />existinggravitysandmediafiltertanks;twonewinlineUV <br />disinfectionsunits;modificationstoanexistinggritbuilding <br />includingtheadditionoftwonewalumstoragetanksandchemical <br />feedequipment;threenewblowersinstalledinanewOperations <br />Buildingthatalsoincludedanelectricalroomandoffice/laboratory <br />space;anewstandbypowergenerator;andallyardpiping,valves, <br />elrical,instrumentation,controls,mechanical,paving,andsite <br />ect <br />worknecessaryforacompleteinstallation <br />RandyDesignBid <br />IsoluxVernalPikeBloomingtonIN10/1/2017IsoluxCorsan,LLC$4,530,403PaulBurtonBobbyWheelerUtilityRelocationfortheI69Corridor <br />TummersBuild(DBB) <br />2015LiftStationReplacement <br />IndianapolisIN6/16/2017TheEticaGroup$2,084,818PaulBurtonJasonDavisTonyStalkerDesignBuildRehabilitationof(2)existingliftstations(LS):LS221andLS320. <br />Package#3LS221&LS320 <br />Theexistingstationsaseachoftheselocationswereexperiencing <br />highlevelsoffailures.Reynoldsreplacedeachstationwithnew <br />2015LiftStationPreplacement <br />submersiblepumps,valvesandotherpiping.Thisinvolvedthe <br />Package#1IndianapolisIN10/13/2016TheEticaGroup$1,183,441PaulBurton <br />JasonDavisTonyStalkerDesignBuild <br />replacementofthewetwellsatalllocationsexceptLS208. <br />(LiftStations;208,301,304and305) <br />Furthermoreitincludedthedemolitionandreplacementofthe <br />existingvalvepitandelectricalequipmentateachlocation. <br />Toincreasethecapacityoftheexistingplantinorderto <br />minimize/eliminateoverflowsduringwetweather.Toimprove <br />Donohue&DesignBid <br />MitchellWWTPImprovementsMitchellIN9/13/2016$2,573,269PaulBurtonDaleFleenorBradGutgsellscreeningoftherawsewageenteringthewastewatertreatment <br />Associates,Inc.Build(DBB) <br />plant.Torepairorreplacesomeoftheagingequipmentandto <br />upgradetheexistingelectricalsystem. <br />Page | 27 <br /> <br />