\[źƭƷƚŅğƷĻƩΉğƭƷĻǞğƷĻƩ9ǣƦĻƩźĻƓĭĻƚŅƚǒƩĻğƒΛYĻǤtĻƩƭƚƓƓĻƌΜ
<br />hǝĻƩƷŷĻ\[ğƭƷЊЉĻğƩƭ
<br />CurrentorActualFinalorCurrentProjectProjectProjectContract
<br />EngineerDescription
<br />ProjectNameCityST
<br />CompletionDateContractAmountExecutiveManagerSuperintendentDelivery
<br />Theprojectincludes,butisnotlimitedto,theconstructionofanew
<br />watertreatmentplant,includinganewforcedaerationunit,two
<br />newhighservicepumps,newhorizontalpressurefilter,chemical
<br />TownofWolcott
<br />CommonwealthDesignBidfeedequipment,mechanicalandHVACsystems,newSCADAsystem,
<br />WaterImprovementProjectDivisionWolcottIN3/25/2020$1,899,387PaulBurton
<br />MikeBenterBryanWeber
<br />Engineers,IncBuild(DBB)andassociatedwatermains,valves,plumbing,sanitarysewers,
<br />WaterTreatmentPlant
<br />earthwork,electricalwork,connectionstoexistingwatermains,and
<br />allotherworkrequiredforthecompleteandfullyoperationalwater
<br />treatmentplant.
<br />ConstructionofanewIronandManganeseWTPincluding3
<br />Substantial
<br />DaveDesignBidhorizontalpressurefilters,4chemicalfeedsystems,backwash
<br />AWCHyettsCornerMiddletownDECompletionDuffieldAssociates$3,443,106PaulBurtonKeithPerkowski
<br />SchrettnerBuild(DBB)supply,finishedwatersupply,backwashstorageandsludgestorage
<br />1/31/2020
<br />facilities.
<br />Thisprojectwasoneofthefinalphasesofamultiplephaseproject
<br />CitizensSludgeLineReplacementtoreplaceapproximately32,000LFoftwinDIpipelinesdueto
<br />DesignBid
<br />Project92MVV00357Phase1.2andIndianapolisIN12/31/2019TheEticaGroup$2,100,000PaulBurtonJasonDavisScottWhalinthehighfailurerateoftheexistinglines.Theselinesareusedto
<br />Build(DBB)
<br />3.0transfersludgebetweentwowastewatertreatment
<br />plants(SouthportandBelmont).
<br />Thepurposeofthisprojectwastoprovidesupplementalcleanwater
<br />WilliamDesignBid
<br />TNRiverCrossingWaterlineChattanoogaTN11/27/2019CTIEngineers,Inc.$3,270,099PaulBurtonMartinHoopertoAWTNcustomersNorthoftheTennesseeRiverbyaddinganew
<br />HarworthBuild(DBB)
<br />waterline.
<br />SubstantialProgressiveConstructnewchemicalbuilding,newrawwaterintakeandpump
<br />MuncieWTFPhase2ImprovementsMuncieINCompletionGannettFleming$19,700,415PaulBurtonAdamRalphJoelStillionsDesignBuildstation,addontotheexistingadminbuilding,andmisc.ancillary
<br />10/21/2019(TargetCost)work.
<br />ConvertedexistingchlorinegasinjectionsystematbothMarlinand
<br />OrmefacilitiestoSodiumHypochlorite.ProjectconsistedofnewFRP
<br />bulktanks,HDPEdaytanks,SCADAsystem,chemicalinjection
<br />transferpumpsandfeedsystems,chemicalpiping,valvesand
<br />appurtenances.Thechlorinegassystemhadtostayoperational
<br />MarlinandOrmeWTFChlorineGasDesignBuilduntiltheconversiontookplace.
<br />GreenwoodIN8/21/2019Black&Veatch$1,968,741PaulBurton
<br />JohnHallBradGutgsell
<br />ConversionDBProject(TargetCost)
<br />Electrical,HVAC,Plumbing,Paintingandsitemodification/upgrade
<br />scopesofworkwereincludedtocompletetheconversion.Reynolds
<br />utilizedexistingfeedpointsandaddedadditionalfeedpointsas
<br />required.Newundergroundchemicalductbankswereinstalled
<br />whileexistingundergroundchemicalpipingremainedinuse.
<br />Installationofapproximately2,500LFofandDICLwater
<br />main,valves,fittingsandappurtenances.Installationof
<br />approximately4,400LFofSteelpipeinstalledviaHDDbeneath
<br />RandyBobbyWheeler,DesignBid
<br />LakeScrantonFinishedWaterTunnelScrantonPA8/21/2019MottMacDonald$19,344,538PaulBurtonEastMountain.Onewettap,onelinestop,onetie
<br />TummersKazRichardsonBuild(DBB)
<br />in,onetiein,andtwosteeltoDICLconnections.
<br />Installationofonenewmetervault,twonewair/vacuumvalve
<br />chambers,andtwopipematerialtransitionteststation.
<br />Page | 26
<br />
<br />
|