Laserfiche WebLink
\[źƭƷƚŅ‘ğƷĻƩΉ‘ğƭƷĻǞğƷĻƩ9ǣƦĻƩźĻƓĭĻƚŅƚǒƩĻğƒΛYĻǤtĻƩƭƚƓƓĻƌΜ <br />hǝĻƩƷŷĻ\[ğƭƷЊЉ—ĻğƩƭ <br />CurrentorActualFinalorCurrentProjectProjectProjectContract <br />EngineerDescription <br />ProjectNameCityST <br />CompletionDateContractAmountExecutiveManagerSuperintendentDelivery <br />Theprojectincludes,butisnotlimitedto,theconstructionofanew <br />watertreatmentplant,includinganewforcedaerationunit,two <br />newhighservicepumps,newhorizontalpressurefilter,chemical <br />TownofWolcott <br />CommonwealthDesignBidfeedequipment,mechanicalandHVACsystems,newSCADAsystem, <br />WaterImprovementProjectDivisionWolcottIN3/25/2020$1,899,387PaulBurton <br />MikeBenterBryanWeber <br />Engineers,IncBuild(DBB)andassociatedwatermains,valves,plumbing,sanitarysewers, <br />WaterTreatmentPlant <br />earthwork,electricalwork,connectionstoexistingwatermains,and <br />allotherworkrequiredforthecompleteandfullyoperationalwater <br />treatmentplant. <br />ConstructionofanewIronandManganeseWTPincluding3 <br />Substantial <br />DaveDesignBidhorizontalpressurefilters,4chemicalfeedsystems,backwash <br />AWCHyettsCornerMiddletownDECompletionDuffieldAssociates$3,443,106PaulBurtonKeithPerkowski <br />SchrettnerBuild(DBB)supply,finishedwatersupply,backwashstorageandsludgestorage <br />1/31/2020 <br />facilities. <br />Thisprojectwasoneofthefinalphasesofamultiplephaseproject <br />CitizensSludgeLineReplacementtoreplaceapproximately32,000LFoftwinDIpipelinesdueto <br />DesignBid <br />Project92MVV00357Phase1.2andIndianapolisIN12/31/2019TheEticaGroup$2,100,000PaulBurtonJasonDavisScottWhalinthehighfailurerateoftheexistinglines.Theselinesareusedto <br />Build(DBB) <br />3.0transfersludgebetweentwowastewatertreatment <br />plants(SouthportandBelmont). <br />Thepurposeofthisprojectwastoprovidesupplementalcleanwater <br />WilliamDesignBid <br />TNRiverCrossingWaterlineChattanoogaTN11/27/2019CTIEngineers,Inc.$3,270,099PaulBurtonMartinHoopertoAWTNcustomersNorthoftheTennesseeRiverbyaddinganew <br />HarworthBuild(DBB) <br />waterline. <br />SubstantialProgressiveConstructnewchemicalbuilding,newrawwaterintakeandpump <br />MuncieWTFPhase2ImprovementsMuncieINCompletionGannettFleming$19,700,415PaulBurtonAdamRalphJoelStillionsDesignBuildstation,addontotheexistingadminbuilding,andmisc.ancillary <br />10/21/2019(TargetCost)work. <br />ConvertedexistingchlorinegasinjectionsystematbothMarlinand <br />OrmefacilitiestoSodiumHypochlorite.ProjectconsistedofnewFRP <br />bulktanks,HDPEdaytanks,SCADAsystem,chemicalinjection <br />transferpumpsandfeedsystems,chemicalpiping,valvesand <br />appurtenances.Thechlorinegassystemhadtostayoperational <br />MarlinandOrmeWTFChlorineGasDesignBuilduntiltheconversiontookplace. <br />GreenwoodIN8/21/2019Black&Veatch$1,968,741PaulBurton <br />JohnHallBradGutgsell <br />ConversionDBProject(TargetCost) <br />Electrical,HVAC,Plumbing,Paintingandsitemodification/upgrade <br />scopesofworkwereincludedtocompletetheconversion.Reynolds <br />utilizedexistingfeedpointsandaddedadditionalfeedpointsas <br />required.Newundergroundchemicalductbankswereinstalled <br />whileexistingundergroundchemicalpipingremainedinuse. <br />Installationofapproximately2,500LFofandDICLwater <br />main,valves,fittingsandappurtenances.Installationof <br />approximately4,400LFofSteelpipeinstalledviaHDDbeneath <br />RandyBobbyWheeler,DesignBid <br />LakeScrantonFinishedWaterTunnelScrantonPA8/21/2019MottMacDonald$19,344,538PaulBurtonEastMountain.Onewettap,onelinestop,onetie <br />TummersKazRichardsonBuild(DBB) <br />in,onetiein,andtwosteeltoDICLconnections. <br />Installationofonenewmetervault,twonewair/vacuumvalve <br />chambers,andtwopipematerialtransitionteststation. <br />Page | 26 <br /> <br />