My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening Request for Qualifications - SB Pinhook WTP Guaranteed Savings Contract - Reynolds Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening Request for Qualifications - SB Pinhook WTP Guaranteed Savings Contract - Reynolds Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2020 1:08:04 PM
Creation date
10/14/2020 1:07:51 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/13/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
JERSEY CITY MUA <br />WTP FILTER IMPROVEMENT PROJECT <br />CONTRACT #25 <br />BOONTON, NEW JERSEY <br />Project Description At a Glance <br />Upgrade and rehabilitationof 80 MGD surface water filtration <br />Contract Amount: <br />plant. Scope consisted of overhaul of gravity filters, replacement <br />$8,026,041 <br />of (64) 20" to 36" motor operated valves, installation of 186’ of 36" <br />Notice to Proceed: <br />DIP, rehabilitation of (2) 120' DIA sludge thickeners and (2) 120' <br />January 1, 2010 <br />DIA backwash tanks which included directional drilling of 10” <br />HDPE piping 16’ below structures. Removal & rehab of 400hp filter <br />Completion Date: <br />backwash pump. Supplied & installed new 200hp backwash tank <br />August 17, 2013 <br />fill pump. <br />MGD: <br />Reynolds removed the failing filter surface wash system and <br />80 <br />associated piping to install a new air scour backwash system <br />including a new totally enclosed air compressor unit with <br />Owner Contact Info: <br />fabricated stainless steel piping. <br />Jersey City MUA <br />Under this project, Reynolds had seven days during a plant wide <br />Kevin Carr <br />shutdown to install two 48” influent channel gates and also <br />(201)432-1150 <br />installed a raw water flow meter in 72” concrete pipe <br />k.carr@jcmua.com <br />underground. Reynolds manufactured, installed and integrated <br />Engineer Contact Info: <br />SCADA and control system while maintaining control and plant <br />United Water New Jersey <br />operation on both systems during transition. All control and <br />John Hroncich <br />instrumentation panels throughout all the buildings <br />(973)335-9806 <br />communicate through fiber optics for reliability. <br />John.hroncich@unitedwater.com <br />Alabama | C olorado | Florida | Georgia | Indiana | Pennsylvania | Tennessee <br />6225 N County Road 75 E, Orleans, IN 47452; (877) 770-0127 <br />Page | 24 <br />www.reynoldscon.com <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.