Laserfiche WebLink
TECHNICAL APPROACH: EXPERIENCE OF TEAM <br />CITY OF SOUTH BEND: PINHOOK WTP IMPROVEMENTS PROJECT GUARANTEED SAVINGS CONTRACT <br />EXPERIENCE OF TEAM’S TECHNICAL ABILITY <br />B.Providers are encouraged to present evidence of their team’s technical ability relative to such anticipated <br />scope of work by providing a list of water/wastewater experience of the team. <br />The key personnel proposed for this contract were selected for their extensive experience with facility and/or utility <br />projects. Their experience includes a dedication to project safety, knowledge of construction, and workload <br />management, to assure that the project team can deliver the required services to the City of South Bend. Reynolds will <br />ensure that we always have sufficient resources available to support the City’s needs for this project. Our team <br />members are local in Indiana and can be regionally supported with other key individuals. We have the ability to <br />supplement this team from approximately 340 staff members across the country if needed. <br />Our team members each have over 19 years of relevant experience and have worked on many similar projects, as <br />evidenced by the list of water and wastewater experience of team members on the following pages. <br /> <br />WORK HISTORY AS A TEAM <br />Reynolds and American Structurepoint have successfully worked together in the past on the following projects: <br />Project Name City ST Completion Date Owner Engineer <br />Citizens Energy CSO Indianapolis INEst. 11/30/2020 Citizens American <br />Energy Group Structurepoint <br />Inc. <br />Fairgrounds Ditch Drainage Lawrenceburg IN8/1/2008 Lawrenceburg American <br />Improvements Conservancy Structurepoint, <br />District Inc <br />WWTP Expansion Rising Sun IN2/12/2007Rising Sun American <br />Municipal Structurepoint, <br />Utilities Inc <br />Page | 23 <br /> <br />