Laserfiche WebLink
SCOTT HUBER, P.E.| Design Manager <br /> <br /> <br />Education: <br />Summary of Qualifications <br />B.S. Civil Engineering, <br />Mr. Huber possesses a unique combination of both design and construction <br />M.S. Environmental Engineering, <br />knowledge in the water/wastewater industry. With over 26 years of experience, <br />University of Illinois <br />he has solved challenging infrastructure problems for dozens of public and private <br /> <br />clients throughout the U.S. Scott began his career designing water and <br />Professional Registration: <br />wastewater projects for Indiana and Illinois municipalities. For the past 20 years, <br />Registered Professional <br />he has focused on the construction and integrated delivery of design-build civil <br />Engineer- IN 79800187 <br />and environmental projects for private industrial, power, and water companies. <br /> <br />Scott enjoys finding cost-effective solutions for his clients and assembling teams <br /> <br />that achieve more working together than they could on their own. <br />Total Years Experience: <br />Project Experience <br />26 <br /> <br /> Bottom Ash Conversion: Santee Cooper, Pineville, SC – Controls <br />Joined Reynolds Construction: <br />Manager. New ash processing facility and WWTP. Contract Amount $54M. <br />2019 Completion 2017. <br /> Mountaineer Generation Station: AEP, New Haven, WV – Operations <br />References: <br />Manager. Design Parameters: Design Influent Flow 600 GPM (0.86 MGD) <br />from FGD, WWT Facility, Combined Influent of CPS from FGD System and <br />Jon Burns <br />Landfill Leachate, Reduction of Selenium from an Influent Concentration of <br />Director of Transmission Services <br />2500 microgram/L to an Effluent Concentration of <25 microgram/L. <br />American Electric Power <br />Technology: Two Stage Biological Reactors, Integrated Project Delivery with <br />(614) 933-2206 <br />GE Water & Process, and Technologies and HDR. Contract Amount $23M. <br /> <br />Completion 2012. <br />Doug Elliott <br />WTP/WWTP:Brandon Shores, Glen Burnie, MD – Combination water <br />Vice President <br />treatment and wastewater treatment plant with biological nitrogen removal. <br />Atlas Industrial Contractors <br />Contract Amount $29M. Completion 2009 <br />(614) 735-3008 <br /> FGD WWTP: Duke Energy, Cayuga, IN – Project Manager. Alliance <br /> <br />contract with Babcock Wilcox Power for construction of a WWTP process <br />Jennifer Bailey, P.E. <br />building. Contract Amount $2M. Completion 2007. <br />Program & Process Manager <br /> Marmet Lock Expansion: US ACOE, Belle, WV – Controls Manager. <br />Citizens Energy Group <br />$225M expansion of a critical lock on the Kanawha River. Completion 2005. <br /> City of Waterford Waterford WTP, Waterford, OH – Construction of a new <br />(317) 964-9552 <br />water treatment plant extracting water from the Muskingum Rover and <br />providing it to a new plant. Contract Amount $2.7M. Completion 2001. <br /> CR 275 Sanitary Pump Station: Pittsboro, IN – Project Engineer. Design <br />of a new sanitary sewer duplex pump station and forcemain to allow Pittsboro <br />to develop a new industrial park. Contract Amount $2M. <br /> WWTP Expansion: Watseka, IL – Design Manager. Expansion of the <br />Town’s wastewater plant and design of a new industrial sewer and lift station. <br />Including a new oxidation ditch, clarifiers, multiple pump stations and <br />anaerobic digester conversion. Contract Amount $5M. <br />Previous Work Experience <br /> 2018: Atlas Industrial Contractors – Columbus Ohio, Director of <br />Operations <br /> 2016-2017: Southern Environmental – Pensacola, Florida, Director – <br />Business Development <br /> 2013-2016: Davis Pickering Corporation – Marietta, Ohio, Vice <br />President <br />City of South Bend: Pinhook WTP Improvements Project GSC <br />Page | 15 <br /> <br />