My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening Request for Qualifications - SB Pinhook WTP Guaranteed Savings Contract - Bowen Engineerig Corporation
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening Request for Qualifications - SB Pinhook WTP Guaranteed Savings Contract - Bowen Engineerig Corporation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2020 12:59:32 PM
Creation date
10/14/2020 12:59:24 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/13/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Djuz!pg!Tpvui!Cfoe <br />Sfrvftu!gps!Rvbmjgjdbujpot <br />d*!!Hfofsbm!Dpotusvdujpo!Tvcdpousbdups;!!Jefoujgz!uif!Hfofsbm!Dpousbdups!Ufbn! <br />Nfncfs!xip!xjmm!qfsgpsn!uif!hfofsbm!dpotusvdujpo!boe!uif!bqqspyjnbuf! <br />qfsdfoubhf!pg!uif!dpousbdu!wbmvf!uibu!tvdi!fggpsu!njhiu!sfqsftfou/!Fyqmbjo! <br />uif!Qspwjefst!bcjmjuz!up!xpsl!xjui!tvdi!Hfofsbm!Dpotusvdujpo!Ufbn!Nfncfs! <br />jodmvejoh!fyqfsjfodf!xpsljoh!uphfuifs!po!qbtu!qspkfdut/ <br />Bowen is a Provider of Indiana Guaranteed Savings Contracts and also a General Contractor who <br />would perform 100% of the general construction. We are also a self-performing General Contractor. <br />Bowen has been a self-performing General Contractor in the water and wastewater industry for over <br />53 years and that is truly the key to our success. We can provide more value in the design phase <br />due to having hands on craft at the table during value engineering meetings. Bowen self-perform <br />craft lowers the cost of your project by not having to pay multiple layers of mark-up. As a self- <br />performing General Contractor we will provide: <br /> A single point of contact for all issues and communications <br /> Cost reductions eliminating a layer of mark-ups <br /> <br /> <br />with the City of South Bend: <br /> <br /> <br /> 2000 - $2.1M Blower Replacement/Generator Improvements (WWTP) <br /> 2010 - $2.2M Blowers 1A & 1B Rehab (WWTP) <br /> 2019 - $1.8M Olive St. Filter Improvements (WTP) <br /> <br />e*!!Puifs!Tvcdpousbdupst!Jowpmwfnfou;!Jefoujgz!xijdi!qpsujpot!pg!uif!qspkfdu!uif! <br />Qspwjefs!joufoet!up!jnqmfnfou!xjui!tvcdpousbdupst!boe!ipx!uif!tvcdpousbdupst! <br />xjmm!joufsbdu!xjui!uif!Ufbn/ <br />There are some items that Bowen does not perform with our own work force. Bowen will still be the <br />single point of contact and accountable for all subcontracted work. We manage our subcontractors <br />as if they were our craft. We hold them to the same safety standards and the same schedule <br />the team. Below are a list of subcontractors and vendors we’ve already spoken with during the <br />proposal phase of the project. We look forward to sitting down with your team to discuss who and <br />when to engage local subcontractors. <br />Subcontractors <br /> Sweney Electric - Multiple past projects (GSC & Traditional) <br /> All-Service Construction Corp. - Multiple past projects (All Traditional) <br />Vendors <br /> BL Anderson (Leopold product supply) - Long standing relationship <br /> FloSource (Valve & Actuator supply) - Long standing relationship <br />$2!Qspwjefs!pg!Joejbob!Xbufs0Xbtufxbufs!HTDt <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.