My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening Request for Qualifications - SB Pinhook WTP Guaranteed Savings Contract - Bowen Engineerig Corporation
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening Request for Qualifications - SB Pinhook WTP Guaranteed Savings Contract - Bowen Engineerig Corporation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2020 12:59:32 PM
Creation date
10/14/2020 12:59:24 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/13/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Djuz!pg!Tpvui!Cfoe <br />Sfrvftu!gps!Rvbmjgjdbujpot <br />Below is a typical schematic overview of the delivery process with major actions of Bowen shown <br />in red, and the Utility in gold. This process has been used on past Guaranteed Saving Contracts <br />Cpxfo!Qfsgpsnbodf!Dpousbdujoh!Ufbn!Jnqmfnfoubujpo! <br /> IDEM Permitting <br /> Sanitary/Water for new <br />services <br /> Gas or electric city <br />Dvtupnfs!Bqqspwft!! <br />services required <br />Dpousbdu <br />beyond existing <br /> Review of state and <br />local permitting and <br />submittal requirements <br /> Review of any local <br />zoning issues for new <br />Dvtupnfs!Ljdl.Pgg! <br />Joufsobm!Ljdl.Pgg! <br />construction <br />Nffujoh <br />Nffujoh0Pqfsbujpot! <br /> On-site fuel <br />Iboe.Pgg storage permitting / <br />requirements <br /> <br />Sfdfjwf!boe!! <br />construction v. <br />Dpnqmfuf! <br />operating permit <br />Bqqspwf!Jowpjdft! <br />Dpotusvdujpo!requirements <br /> <br />Esbxjoht! <br />for permitting <br />processes and <br />Sfhvmbs!Qspkfdu! <br />constraints before <br /> Establish timing <br />Tubuvt!Nffujoh <br />permits are issued <br />and design of <br />Sfhvmbupsz!Bqqspwbmt! <br /> Mobilize consultants <br />project meetings <br />boe!Npcjmj{f! <br /> Invoicing <br />Efmjwfsz!Ufbn! <br /> Clean work-site <br />program <br /> Safety program <br />enforcement & <br />Jnqmfnfou!! <br />postings <br />Qspkfdu <br /> Documentation of <br /> <br /> <br />required by <br /> Punch Lists <br />contract <br /> Conduct & Document <br />Dpnnjttjpojoh! <br />by contract <br /> Collect post- <br />construction data <br /> Customer training <br />Tvctuboujbm!Dpnqmfujpo! <br />Dmptf!Pvu! <br />Qspkfdu <br />Dpnqmfuf!Bt.Cvjmu! <br />Esbxjoht! <br /> Final billing & invoicing <br /> Manuals/Submittals <br />Hvbsbouff!Sfqpsujoh <br /> Transfer warranties <br />gps!Mjgf!pg!Dpousbdu! <br /> As-built drawings <br /> <br />completion <br />$2!Qspwjefs!pg!Joejbob!Xbufs0Xbtufxbufs!HTDt <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.