My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening Request for Qualifications - SB Pinhook WTP Guaranteed Savings Contract - Bowen Engineerig Corporation
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening Request for Qualifications - SB Pinhook WTP Guaranteed Savings Contract - Bowen Engineerig Corporation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2020 12:59:32 PM
Creation date
10/14/2020 12:59:24 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/13/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Nvmujqmf!Hvbsbouffe!Tbwjoht!Dpousbdu!Dpnnvojuz <br />QSPKFDU!TDPQF! <br />Djuz!pg!Efmqij!! <br />HTD!Xbufs!Tztufn!Jnqspwfnfout!Efmqij-!JO! <br />Site Work <br />• <br />Upubm!Dpousbdu;!!%23-:33-958 <br />Civil/Concrete <br />• <br />Gfcsvbsz!312:!.!Pdupcfs!3131 <br />Underground Piping <br />• <br />Equipment Setting <br />• <br />Bowen, teaming with Butler Fairman & Suefert, is completing 2 phases of Water <br />Mechanical/Piping <br />• <br />System improvements for the City of Delphi. Improvements included >3,200 LF <br />Architectural/Finishing <br />• <br />of water main, a booster station, a new well house, and a new water storage tank. <br />Project work occurred through 2 separate phases, and will allow Delphi to update <br />QSPKFDU!TQFDT! <br />aging equipment and increase capacity. <br />Nvmujqmf!Dpousbdu!Qibtft <br />Project Challenges <br />Phase 1 <br />The project occurred in rocky soils and required a 2-excavator operation. The <br />• <br />• <br />Phase 2 <br />• <br />removing material. <br />Jodmvefe!Jogsbtusvduvsf!Vqebuft <br />• <br />(2) 30’ Tall Aerators <br />shut down. Bowen also installed the water line through a golf course and <br />• <br />1,000 LF 12” PVC <br />worked with the city along with the course to minimize disruption. <br />• <br />2,200 LF 16” PVC <br />• <br />• <br />• <br />equipment to optimize value for the client. <br />• <br />Booster Station <br />• <br />Bowen Results <br />• <br />Chemical Feed <br />Bowen used multiple city-preferred local subcontractors and was responsive <br />• <br />• <br />Water Storage Tank <br />to owner preferred equipment including controls requests. <br />• <br />! <br />Bowen met a key milestone delivering the City’s new well to support <br />• <br />increased water demand. <br />Qspkfdu!Ufbn <br />Bowen was able to deliver >$500,000 of savings to the City. <br />• <br />Project Manager: Pat Stanford <br />• <br />• <br />Project Engineer: Mitchell Stull <br />part of town and was able to procure the parts, repair the break, and repour <br />• <br />Superintendent: Tim Wotherspoon <br />the sidewalk the same day. <br />• <br />Engineering Partner: BF&S <br />There were Zero Injuries and Incedents on the project. <br />• <br />• <br /> <br /> <br />xxx/cpxfofohjoffsjoh/dpn <br />SFTPVSDFGVM/!SFTQPOTJWF/!SFTVMUT/! <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.