Laserfiche WebLink
Nvmujqmf!Hvbsbouffe!Tbwjoht!Dpousbdu!Dpnnvojuz <br />Djuz!pg!Wbmqbsbjtp! <br />QSPKFDU!TDPQF! <br />HTD!XUQ!Jnqspwfnfout!0!Wbmqbsbjtp-!JO! <br />Site Work <br />• <br />Qspkfdu!Tj{f;!!%25-643-111!!0!!Nbsdi!3126!.!Nbz!3127 <br />Civil/Concrete Work <br />• <br />Underground Piping <br />The City of Valparaiso selected Bowen to construct updates to its existing water <br />• <br />Structural Steel Erection <br />treatment plant. Upgrades included 8 new water wells and well houses, 5 miles of <br />• <br />water main, 2 one-million gallon water storage tanks, rehabilitation of 2 existing <br />Pre-Engineered Building(s) <br />• <br />Equipment Setting <br />• <br />Ductwork <br />• <br />Mechanical/Piping <br />• <br />electrical, and instrumentation and controls upgrade. <br />QSPKFDU!TQFDT <br />Qspkfdu!Dibmmfohft: <br />8 new water wells and well houses <br />• <br />Multiple site locations throughout the City of Valparaiso <br />5 miles of water main <br />• <br />• <br />Multiple tie ins required planning, resourcefulness, and coordination with <br />2 new 1-million gallon water storage <br />• <br />• <br />the Owner and Engineer <br />tanks and rehab 2 existing tanks <br />PEMB addition <br />• <br />Cpxfo!Sftpvsdfgvm; <br />• <br />Collaborated with the Owner and Engineer on the project constructability <br />2 new high service pumps <br />• <br />• <br />and equipment selection that resulted in cost and schedule savings <br />• <br />• <br />Cpxfo!Sftqpotjwf;! <br />tank <br />Upgraded the existing facility without interrupting the plant’s pumping <br />• <br />• <br />capabilities <br />HVAC <br />• <br />Cpxfo!Sftvmut; <br />QSPKFDU!UFBN! <br />Zero Injury <br />• <br />Zero Incidents <br />• <br />!Project Manager: Pat Stanford, Bowen <br />• <br /> 219.661.9770 <br />the Owner <br /> <br /> Client Contact: Steve Poulos <br /> <br />xxx/cpxfofohjoffsjoh/dpn <br />SFTPVSDFGVM/!SFTQPOTJWF/!SFTVMUT/! <br /> <br />