REGULAR MEETING SEPTEMBER 8, 2020 158
<br />the amount of $54,258. Upon a motion made by Ms. Maradik, seconded by Mr. Molnar and
<br />carried by roll call, the Change Order was approved.
<br />APPROVE CHANGE ORDER NO. 3 — SEWER AND MANHOLE REHABILITATION —
<br />PROJECT NO. 118-093 (PO-0000097)
<br />Mr. Gilot advised that Ms. Sue Ellen Doudrick, Engineering, has submitted Change Order No. 3
<br />on behalf of Inland Water Pollution Control, Inc., 4086 Michigan Ave., Detroit, MI 48210,
<br />indicating the contract amount be decreased by $65,940 for a new contract sum, including this
<br />Change Order, in the amount of $3,153,439.60. Upon a motion made by Ms. Maradik, seconded
<br />by Mr. Molnar and carried by roll call, the Change Order was approved.
<br />APPROVE CHANGE ORDER NO. 1 (FINAL) AND PROJECT COMPLETION AFFIDAVIT
<br />— WAYNE ST. & LEIGHTON PLAZA PARKING STRUCTURES REPAIRS 2019 —
<br />PROJECT NO. 119-048 (PO-0000444)
<br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. 1 (Final) on
<br />behalf of D.C. Byers Co./Detroit Inc., 16429 Upton Rd., Suite #3, East Lansing, MI 48823,
<br />indicating the contract amount be decreased by $20,671.25 for a new contract sum, including this
<br />Change Order, of $347,658.75. Also submitted was the Project Completion Affidavit indicating
<br />this new final cost of $347,658.75. Upon a motion made by Ms. Maradik, seconded by Mr.
<br />Molnar and carried by roll call, Change Order No. 1 (Final) and the Project Completion Affidavit
<br />were approved.
<br />APPROVE PROJECT COMPLETION AFFIDAVIT — CLEVELAND SOUTH WELL FIELD
<br />BULK FLUORIDE TANK REPLACEMENT — PROJECT NO. 118-021B (RWDA TIF)
<br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted the Project Completion
<br />Affidavit on behalf of Larson -Danielson Construction Co, Inc., 302 Tyler St., LaPorte, IN 46350,
<br />for the above referenced project, indicating a final cost of $29,885. Upon a motion made by Ms.
<br />Maradik, seconded by Mr. Molnar and carried by roll call, the Project Completion Affidavit was
<br />approved.
<br />APPROVE PROJECT COMPLETION AFFIDAVIT — LIBERTY TOWER EXTERIOR
<br />RENOVATIONS, DIVISION B — PROJECT NO. 118-086R (RWDA TIF)
<br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted the Project Completion
<br />Affidavit on behalf of Mulder Waterproofing and Sealants, Inc., 3420 Ravine Rd., Kalamazoo,
<br />MI 49026, for the above referenced project, indicating a final cost of $303,665. Upon a motion
<br />made by Ms. Maradik, seconded by Mr. Molnar and carried by roll call, the Project Completion
<br />Affidavit was approved.
<br />TABLE PROJECT COMPLETION AFFIDAVIT — 315 & 319 W. JEFFERSON EXTERIOR
<br />RENOVATIONS, DIVISION C — PROJECT NO. 119-064 (RWDA TIF)
<br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted the Project Completion
<br />Affidavit on behalf of Walsh & Kelley, Inc., 24358 State Road 23, South Bend, IN 46614, for
<br />the above referenced project, indicating a final cost of $47,845. Ms. Maradik noted the Board has
<br />been asked to table their approval and made a motion to table the project completion affidavit.
<br />Mr. Molnar seconded the motion, which carried by roll call. The Project Completion Affidavit
<br />was tabled.
<br />APPROVAL OF REQUEST TO ADVERTISE FOR THE RECEIPT OF BIDS — FOUR (4),
<br />MORE OR LESS, 2020 OR NEWER STANDARD AWD 4-DOOR UTILITY VEHICLES —
<br />SPEC I (PR-00003050)
<br />In a memorandum to the Board, Mr. Jeff Hudak, Central Services, requested permission to
<br />advertise for the receipt of bids for the above referenced vehicles. Therefore, upon a motion
<br />made by Ms. Maradik, seconded by Mr. Molnar and carried by roll call, the above request was
<br />approved.
<br />APPROVAL OF REQUEST TO ADVERTISE FOR THE RECEIPT OF BIDS AND TITLE
<br />SHEET — WASTEWATER TREATMENT PLANT MASONRY IMPROVEMENTS
<br />GALLERY BUILDINGS 1-4 — PROJECT NO. 120-036 (PR-00003823)
<br />In a memorandum to the Board, Mr. Jacob Klosinski, Engineering, requested permission to
<br />advertise for the receipt of bids for the above referenced project. Also presented at this time for
<br />approval and execution was the Title Sheet. Upon a motion made by Ms. Maradik, seconded by