My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LPA Utility Reimbursement Agreement - City to Pay 20% of Construction Costs for Douglas Road Lift – St. Joseph County Board of Commissions
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
LPA Utility Reimbursement Agreement - City to Pay 20% of Construction Costs for Douglas Road Lift – St. Joseph County Board of Commissions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2020 3:14:07 PM
Creation date
9/23/2020 3:14:05 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
9/22/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ItemDescriptionQTYUnitUnit PriceTotal Amount <br />WATER MAIN <br />202-97009FIRE HYDRANT ASSEMBLY, REMOVE6EA$610.00$3,660.00 <br />715-01336GATE VALVE 12 IN. \[W/ RISER BOX\]2EA$3,915.00$7,830.00 <br />715-04995LINE STOP \[12 IN.\]2EA$9,336.68$18,673.36 <br />715-90853TAPPING SLEEVE AND VALVE \[12 IN., W/ RISER BOX\]1EA$6,743.88$6,743.88 <br />715-92544WATER MAIN, DUCTILE IRON, 12 IN350LFT $141.47$49,514.50 <br />715-92544WATER MAIN, BRIDGE SUPPORTED, 12 IN71LFT $675.00$47,925.00 <br />715-94530ADJUST WATER VALVE TO GRADE16EA$613.80$9,820.80 <br />715-94780WATER MAIN, DUCTILE IRON, 6 IN337LFT $88.00$29,656.00 <br />720-96999FIRE HYDRANT ASSEMBLY7EA$6,289.23$44,024.61 <br />SUBTOTAL, WATER MAIN$217,848.15 <br />TOTAL CONSTRUCTION (ROUNDED)$2,265,900.00 <br />CONSTRUCTION INSPECTION (12.5% OF CONSTRUCTION COSTS)$283,200.00 <br />TOTAL CONSTRUCTION & INSPECTION$2,549,100.00 <br />(-) BETTERMENT (GENERATOR)$75,000.00 <br />TOTAL ELIGIBLE FOR FEDERAL FUNDS (PARTICIPATING)$2,474,100.00 <br />FEDERAL FUNDS PORTION (80%) <br />$1,979,280.00 <br />CITY OF SB PORTION (20%) <br />$494,820.00 <br />TOTAL CITY OF SB RESPONSIBILITY (20% CITY PORTION + BETTERMENT) <br />$569,820.00 <br />2 of 2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.