Opinion of Probable•;
<br />Douglas Road Lift Station Replacement, Force Main & Water Main Relocatiol
<br />LUMP SUM PERCENTAGE ITEMS
<br />105-06845
<br />CONSTRUCTION ENGINEERING (2% of Const Amounts Below)
<br />1
<br />LS
<br />2%
<br />$41,200.00
<br />110-01001
<br />MOBILIZATION & DEMOBILIZATION (5% of Const Amounts Below)
<br />1
<br />LS
<br />5%
<br />$103,000.00
<br />201-52370
<br />CLEARING RIGHT OF WAY (3% of Const Amounts Below)
<br />1
<br />LS
<br />3%
<br />$61,800.00
<br />SUBTOTAL, LUMP SUM PERCENTAGE ITEMS
<br />$206,000.00
<br />LIFT STATION AND FORCEMAIN
<br />202-07083
<br />REMOVAL, LIFT STATION
<br />1
<br />LS
<br />$25,000.00
<br />$25,000.00
<br />203-04523
<br />DEWATERING LIFT STATION
<br />1
<br />LS
<br />$150,000.00
<br />$150,000.00
<br />207-08264
<br />SUBGRADETREATMENT TYPE II
<br />330
<br />SYS
<br />$17.56
<br />$5,794.80
<br />211-02050
<br />B BORROW
<br />1,750
<br />CYS
<br />$34.26
<br />$59,955.00
<br />211-09266
<br />STRUCTURE BACKFILL TYPE 1
<br />2,363
<br />CYS
<br />$32.78
<br />$77,459.14
<br />213-09269
<br />FLOWABLE BACKFILL, NONREMOVABLE (FORCEMAIN &
<br />WATERMAIN RETIRE IN PLACE
<br />64
<br />CYS
<br />$294.70
<br />$18,860.80
<br />303-01180
<br />COMPACTED AGGREGATE NO. 53
<br />85
<br />TON
<br />$25.53
<br />$2,170.05
<br />603-09065
<br />FENCE GATE, CHAIN LINK, 72 IN X 24 FT
<br />1
<br />EA
<br />$5,000.00
<br />$5,000.00
<br />603-09066
<br />FENCE CHAIN LINK PVC COATED 72 IN
<br />189
<br />LFT
<br />$27.50
<br />$5,197.50
<br />610-09108
<br />PCCP FOR APPROACHES 9 IN
<br />313
<br />SYS
<br />$74.90
<br />$23,443.70
<br />621-04258
<br />SEED MIXTURE FLOODPLAIN
<br />12
<br />LB
<br />$163.22
<br />$1,958.64
<br />621-06565
<br />MULCHING MATERIAL
<br />0.34
<br />TON
<br />$424.77
<br />$144.42
<br />621-06570
<br />TOPSOIL
<br />134
<br />CYS
<br />$33.00
<br />$4,422.00
<br />621-08538
<br />MULCH
<br />26
<br />CYS
<br />$75.00
<br />$1,950.00
<br />622-05638
<br />PLANT, DECIDUOUS SHRUB, 18 IN. OR UNDER
<br />9
<br />EA
<br />$70.67
<br />$636.03
<br />715-04987
<br />CONNECTION TO EXISTING MANHOLE, SANITARY
<br />1
<br />EA
<br />$7,500.00
<br />$7,500.00
<br />715-05408
<br />PIPE, SANITARY SEWER, 8", PVC SDR 35
<br />161
<br />LFT
<br />$155.62
<br />$25,054.82
<br />715-05411
<br />PIPE, SANITARY SEWER, 12", PVC SDR 35
<br />136
<br />LFT
<br />$125.00
<br />$17,000.00
<br />715-09064
<br />VIDEO INSPECTION FOR PIPE
<br />3,217
<br />LFT
<br />$1.25
<br />$4,021.25
<br />715-09843
<br />BYPASS PUMPING
<br />1
<br />LS
<br />$40,000.00
<br />$40,000.00
<br />715-90052
<br />LIFT STATION
<br />1
<br />LS
<br />$745,000.00
<br />$745,000.00
<br />715-92253
<br />SEWER SANITARY LATERAL RECONNECT
<br />1
<br />EA
<br />$5,106.43
<br />$5,106.43
<br />715-98961
<br />FORCEMAIN, DUCTILE IRON, 10"
<br />2,569
<br />LFT
<br />$120.00
<br />$308,280.00
<br />715-98961
<br />FORCEMAIN, DUCTILE IRON, 10", TRENCHLESS
<br />351
<br />LFT
<br />$550.00
<br />$193,050.00
<br />716-01382
<br />AIR RELEASE VALVE
<br />2
<br />EA
<br />$12,000.00
<br />$24,000.00
<br />720-03194
<br />MANHOLE, SANITARY SEWER
<br />1
<br />EA
<br />$8,000.00
<br />$8,000.00
<br />720-03194
<br />MANHOLE, SANITARY SEWER, SADDLE STRUCTURE
<br />1
<br />EA
<br />$8,000.00
<br />$8,000.00
<br />715-90052
<br />LIFT STATION, GENERATOR (BID ALTERNATE)
<br />1
<br />LS
<br />$75,000.00
<br />$75,000.00
<br />SUBTOTAL, SANITARY LIFT STATION AND FORCEMAIN
<br />$1,842,004.58
<br />1of2
<br />
|