Laserfiche WebLink
Opinion of Probable•; <br />Douglas Road Lift Station Replacement, Force Main & Water Main Relocatiol <br />LUMP SUM PERCENTAGE ITEMS <br />105-06845 <br />CONSTRUCTION ENGINEERING (2% of Const Amounts Below) <br />1 <br />LS <br />2% <br />$41,200.00 <br />110-01001 <br />MOBILIZATION & DEMOBILIZATION (5% of Const Amounts Below) <br />1 <br />LS <br />5% <br />$103,000.00 <br />201-52370 <br />CLEARING RIGHT OF WAY (3% of Const Amounts Below) <br />1 <br />LS <br />3% <br />$61,800.00 <br />SUBTOTAL, LUMP SUM PERCENTAGE ITEMS <br />$206,000.00 <br />LIFT STATION AND FORCEMAIN <br />202-07083 <br />REMOVAL, LIFT STATION <br />1 <br />LS <br />$25,000.00 <br />$25,000.00 <br />203-04523 <br />DEWATERING LIFT STATION <br />1 <br />LS <br />$150,000.00 <br />$150,000.00 <br />207-08264 <br />SUBGRADETREATMENT TYPE II <br />330 <br />SYS <br />$17.56 <br />$5,794.80 <br />211-02050 <br />B BORROW <br />1,750 <br />CYS <br />$34.26 <br />$59,955.00 <br />211-09266 <br />STRUCTURE BACKFILL TYPE 1 <br />2,363 <br />CYS <br />$32.78 <br />$77,459.14 <br />213-09269 <br />FLOWABLE BACKFILL, NONREMOVABLE (FORCEMAIN & <br />WATERMAIN RETIRE IN PLACE <br />64 <br />CYS <br />$294.70 <br />$18,860.80 <br />303-01180 <br />COMPACTED AGGREGATE NO. 53 <br />85 <br />TON <br />$25.53 <br />$2,170.05 <br />603-09065 <br />FENCE GATE, CHAIN LINK, 72 IN X 24 FT <br />1 <br />EA <br />$5,000.00 <br />$5,000.00 <br />603-09066 <br />FENCE CHAIN LINK PVC COATED 72 IN <br />189 <br />LFT <br />$27.50 <br />$5,197.50 <br />610-09108 <br />PCCP FOR APPROACHES 9 IN <br />313 <br />SYS <br />$74.90 <br />$23,443.70 <br />621-04258 <br />SEED MIXTURE FLOODPLAIN <br />12 <br />LB <br />$163.22 <br />$1,958.64 <br />621-06565 <br />MULCHING MATERIAL <br />0.34 <br />TON <br />$424.77 <br />$144.42 <br />621-06570 <br />TOPSOIL <br />134 <br />CYS <br />$33.00 <br />$4,422.00 <br />621-08538 <br />MULCH <br />26 <br />CYS <br />$75.00 <br />$1,950.00 <br />622-05638 <br />PLANT, DECIDUOUS SHRUB, 18 IN. OR UNDER <br />9 <br />EA <br />$70.67 <br />$636.03 <br />715-04987 <br />CONNECTION TO EXISTING MANHOLE, SANITARY <br />1 <br />EA <br />$7,500.00 <br />$7,500.00 <br />715-05408 <br />PIPE, SANITARY SEWER, 8", PVC SDR 35 <br />161 <br />LFT <br />$155.62 <br />$25,054.82 <br />715-05411 <br />PIPE, SANITARY SEWER, 12", PVC SDR 35 <br />136 <br />LFT <br />$125.00 <br />$17,000.00 <br />715-09064 <br />VIDEO INSPECTION FOR PIPE <br />3,217 <br />LFT <br />$1.25 <br />$4,021.25 <br />715-09843 <br />BYPASS PUMPING <br />1 <br />LS <br />$40,000.00 <br />$40,000.00 <br />715-90052 <br />LIFT STATION <br />1 <br />LS <br />$745,000.00 <br />$745,000.00 <br />715-92253 <br />SEWER SANITARY LATERAL RECONNECT <br />1 <br />EA <br />$5,106.43 <br />$5,106.43 <br />715-98961 <br />FORCEMAIN, DUCTILE IRON, 10" <br />2,569 <br />LFT <br />$120.00 <br />$308,280.00 <br />715-98961 <br />FORCEMAIN, DUCTILE IRON, 10", TRENCHLESS <br />351 <br />LFT <br />$550.00 <br />$193,050.00 <br />716-01382 <br />AIR RELEASE VALVE <br />2 <br />EA <br />$12,000.00 <br />$24,000.00 <br />720-03194 <br />MANHOLE, SANITARY SEWER <br />1 <br />EA <br />$8,000.00 <br />$8,000.00 <br />720-03194 <br />MANHOLE, SANITARY SEWER, SADDLE STRUCTURE <br />1 <br />EA <br />$8,000.00 <br />$8,000.00 <br />715-90052 <br />LIFT STATION, GENERATOR (BID ALTERNATE) <br />1 <br />LS <br />$75,000.00 <br />$75,000.00 <br />SUBTOTAL, SANITARY LIFT STATION AND FORCEMAIN <br />$1,842,004.58 <br />1of2 <br />