My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Dedicated Improvements Agreement - Terms for City Water and Sewer Extension and Dedication of Dylan Dr. - GLC Portage Prairie IV, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
Dedicated Improvements Agreement - Terms for City Water and Sewer Extension and Dedication of Dylan Dr. - GLC Portage Prairie IV, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2020 3:12:51 PM
Creation date
9/23/2020 3:12:45 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
9/22/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DEDICATED IMPROVEMENTS AGREEMENT <br />nd <br />This Dedicated Improvements Agreement (the is made on this 22 day of <br />September 2020, by and between the City of South Bend, Indiana, an Indiana municipal <br />corporation , acting by and through its Board of Public Works (the "Board"), and GLC <br />Portage Prairie IV, LLC, an Indiana limited liability company with an address of 112 W. Jefferson <br />Blvd, STE. 200 South Bend IN 46601 (the construct dedicated <br />improvements in a future public right-of-way (future R.O.W.) <br />boundaries Project Area. <br />WHEREAS, Owner intends to develop approximately 119 acres of real estate located <br />within the City, as shown on the proposed Subdivision Plat attached hereto as Exhibit A and <br />incorporated herein by reference; and <br />WHEREAS, Owner has previously installed sidewalk, curb, landscaping, trees, drive <br />approaches, sanitary sewer, storm sewer, water main, hydrants, and asphalt pavement in future <br />Existing Improvements for Dedication <br />Exhibit B, attached hereto and incorporated herein by reference, which improvements are located <br />adjacent to Lot 1; and <br />WHEREAS, Owner intends to install sidewalk, curb, lighting, landscaping, trees, drive <br />approaches, sanitary sewer, storm sewer, water main, hydrants, and asphalt pavement in future <br />R.O.W. Future Improvements for Dedication and with the Existing Improvements for <br />) as more particularly described as Phase 1B in Exhibit <br />B; and <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.