My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No. 2 to Owner-Engineer Agreement - Design Services for West Race Gate Repair and West Bank Corridor – Lawson-Fisher Associates
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No. 2 to Owner-Engineer Agreement - Design Services for West Race Gate Repair and West Bank Corridor – Lawson-Fisher Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 8:41:46 AM
Creation date
9/23/2020 3:08:12 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
9/22/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
d. For the Additional Services or the modifications to services set forth above, Owner <br />shall pay Engineer the following additional or modified compensation utilizing a <br />Direct Labor Costs Times Factor, Plats Reimburscables described below: <br />Using the procedures set forth in Paragraph 2.01, Owner shall pay Engineer for the <br />additional services as follows: <br />1) An amount equal to Engineer's Direct Labor Costs times a factor of 3.1521 <br />for services of Engineer's employees engaged on the Project, plus <br />reimbursable expenses, and Engineer's consultants' charges, if any. <br />2) The total compensation for services and reimbursable expenses is not to <br />exceed $25,600.00 without written authorization. <br />3) Engineer's Standard Hourly Rate rates are attached as revised Appendix 1. <br />e. The schedule for rendering services is modified as follows: <br />Project schedule shall be revised as follows: <br />• Submittal of 401/404 permits 14 days after NTP <br />• Submittal of IDNR permit 14 days after NTP <br />• Revised Bid Documents 30 days after NTP <br />• Project Ready for Bid 14 days after receipt of permits <br />Assume 6 months from time of permit submittal to receipt of permits along with <br />the above schedule. <br />f. Other portions of the Agreement (including previous amendments, if any) are <br />modified as follows: <br />Attachment 1 (revised) <br />5. Agreement Summary (Reference only) <br />a. Original Agreement amount: <br />$ <br />19,600.00 <br />b. Net change for prior amendments: <br />$ <br />5,500.00 <br />C. This amendment amount: <br />$ <br />25,600.00 <br />d. Adjusted Agreement amount: <br />$ <br />50,700.00 <br />The foregoing Agreement Summary is for reference only and does not alter the terms of the Agreement, <br />including those set forth in Exhibit C. <br />Page 3 <br />(Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Societe of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.