Laserfiche WebLink
This is EXHIBIT K, consisting of 4 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated November 8.2016. <br />AMENDMENT TO OWNER -ENGINEER AGREEMENT <br />Amendment No. 2 <br />1. Background Data: <br />a. Effective Date of Owner -Engineer Agreement: November 8, 2016 <br />b. Owner: Board of Public Works, City of South Bend, Indiana <br />C. Engineer: <br />Lawson -Fisher Associates P.C. <br />d. Project: South Bend Dam, West Race Repairs <br />Citv Proiect No. 115-115 <br />2. Description of Modifications: <br />[NOTE TO USER: Include the following paragraphs that are appropriate and delete those not applicable to <br />this amendment. Refer to paragraph numbers used in the Agreement or a previous amendment for clarity <br />with respect to the modifications to be made. Use paragraph numbers in this document for ease of <br />reference herein and in future correspondence or amendments.] <br />a. Engineer shall perform or furnish the fbllowing Additional Services: <br />In addition to the contracted Scope of Work fbr the South Bend Dam, West Race <br />Repairs, LFA will provide the fbllowing additional services: <br />Revise the bid documents to be publicly bid as a standalone project. Bid <br />documents will utilize current City of South Bend fbrmat. This addendum <br />assumes that the existing plans will not require revisions such as design <br />details, staging areas, site access, walkway, or railing details. The fbllowing <br />tasks shall be perfbrmed: <br />a. Separate existing plans sheets, specifications and contract <br />documents to form a stand-alone bid document. <br />b. Create new cover sheet for signature. <br />C. Coordinate with Century Center and include any restrictions fbr site <br />access and schedule in the specifications. <br />d. Address permitting agency requirements in detailed specifications. <br />e. Update INDOT 2018 specification references to 2020 standard <br />specifications and review for accuracy. <br />2. Update and resubmit permitting documents. Permits were submitted in 2018 <br />for this project but were either waived or put on hold due to the emergency <br />nature of the project. Permits will need to be resubmitted along with <br />Pagc 1 <br />(Exhibit K— (Amendment to Owner -Engineer Agreement) — Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />