My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Liberty Tower Exterior Renovations, Phase II Proj No. 120-047 - Slatile Roofing & Sheet Metal Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening of Quotes - Liberty Tower Exterior Renovations, Phase II Proj No. 120-047 - Slatile Roofing & Sheet Metal Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 8:47:52 AM
Creation date
9/23/2020 2:02:01 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/22/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Liberty Tower Exterior Renovations - Ph 2 © Copyright, Kil Architecture / Planning <br />South Bend, Indiana September 2020 <br />B. Concrete and Masonry: Prior to priming, patch holes and indentations and fill cracks with <br />manufacturer's recommended crack repair material. <br />3.4 COATING APPLICATION <br />A. Apply coatings in accordance with manufacturer's instructions, to thicknesses specified. <br />B. Apply in uniform thickness coats, without runs, drips, pinholes, brush marks, or variations in <br />color, texture, or finish. Finish edges, crevices, corners, and other changes in dimension with <br />full coating thickness. <br />3.5 CLEANING <br />A. Collect waste material that could constitute a fire hazard, place in closed metal containers, and <br />remove daily from site. <br />B. Clean surfaces immediately of overspray, splatter, and excess material. <br />C. After coating has cured, clean and replace finish hardware, fixtures, and fittings previously <br />removed. <br />3.6 PROTECTION <br />A. Protect finished work from damage. <br />END OF SECTION <br />CONCRETE AND MASONRY 09 9723 - 4 <br />COATINGS <br />
The URL can be used to link to this page
Your browser does not support the video tag.