My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Liberty Tower Exterior Renovations, Phase II Proj No. 120-047 - Slatile Roofing & Sheet Metal Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening of Quotes - Liberty Tower Exterior Renovations, Phase II Proj No. 120-047 - Slatile Roofing & Sheet Metal Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 8:47:52 AM
Creation date
9/23/2020 2:02:01 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/22/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Liberty Tower Exterior Renovations - Ph 2 © Copyright, Kil Architecture / Planning <br />South Bend, Indiana September 2020 <br />B. Applicator Qualifications: Company specializing in performing the work of this section with <br />minimum three years documented experience. <br />1.6 MOCK-UP <br />A. Provide mock-up, 4 feet long by 4 feet wide, illustrating coating, color, and surface sheen, for <br />each specified coating. <br />B. Locate where directed. <br />C. Mock-up may remain as part of the Work. <br />1.7 WARRANTY <br />A. See Section 017800 - Closeout Submittals, for additional warranty requirements. <br />B. Correct defective Work within a one year period after Date of Substantial Completion. <br />C. Warranty: Include coverage for bond to substrate for a period of five years from the Date of <br />Substantial Completion. <br />PART 2 PRODUCTS <br />2.1 MANUFACTURERS <br />A. Concrete and Masonry Coatings: <br />1. The Sherwin-Williams Company: www.sherwin-williams.com. <br />2. Substitutions: Section 01 6000 -Product Requirements. <br />2.2 CONCRETE AND MASONRY COATINGS <br />A. Provide high -build, weather resistant coating systems that meet the following minimum <br />performance criteria, unless more stringent criteria are specified: <br />1. Salt Spray Resistance: Passes when tested according to ASTM B 117 for 2000 hours. <br />2. Surface Burning Characteristics: Flame spread/Smoke developed index of 0/0, <br />maximum, when tested in accordance with ASTM E84. <br />3. Accelerated Outdoor Exposure: Passes when tested according to ASTM G153 for 5,000 <br />hours. <br />2.3 MATERIALS <br />A. Coatings - General: Provide complete systems formulated and recommended by manufacturer <br />for the applications indicated, in the thicknesses indicated. <br />1. Maximum volatile organic compound (VOC) content: As required by applicable <br />regulations. <br />CONCRETE AND MASONRY 09 9723 - 2 <br />COATINGS <br />
The URL can be used to link to this page
Your browser does not support the video tag.