My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Two (2) More or Less Custom Rear Mount Pumpers Spec C - Sentinel Emergency Solutions
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - Two (2) More or Less Custom Rear Mount Pumpers Spec C - Sentinel Emergency Solutions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 4:49:49 PM
Creation date
9/14/2020 4:47:53 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/8/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Bend Fire Department <br />CommanderChassis <br />Thecabheadershallfeaturedual6061-T6Aluminumextrusionswhichshalloffersuperiorrigidity <br />and strength. <br />Theraisedroofshallofferacrewheadheightareaof63-1/2”fromthefloortotheceilinginthe <br />crewareas for optimum headroom. <br />The crew roof super structure shall includea reinforcement hat-section structure 1/8” thick 5052- <br />H32 Aluminum bracing. The for-aft support braces will be 24” on center apart, the side to side <br />support braceswill stretch from cab side to cab side and centeredbetweenthe dual 3/16” <br />extruded and plate reinforced roll-cagesection. <br />The forwardcab roof section shall include a combination of 1/8” 6061-T6 extruded tube <br />reinforcements anda hat-section structure 1/8” thick 5052-H32 Aluminum bracing. The bracing <br />shall wrap the entire perimeter of thecab forwardroof, and thecondensersupport structure. <br />The condenser support structure shall include 1/8” triple sections, supporting the outer perimeter <br />and center of thecondenser mounting pad. <br />Additionally, the entire roof super structure is reinforced bya .25” thick roof edge corner <br />extrusion around the entire cab perimeter. <br />Adriprailshallbeprovidedalongthetopradiusofeachcabside.Thedriprailsshallhelpprevent <br />waterfrom the cabroofrunning down the cab side. <br />One (1)Cab DripRailExtension <br />03-04-0004 <br />DRIP RAIL EXTENSION <br />The cab shall have a drip rail extension in front ofthe driver and officer doors. The drip rail shall <br />be connected to the rail along the roof and run midway down the “A” pillar to help prevent water <br />from entering thecab when the front doorsare opened. Therail shall be painted to match the cab <br />exterior paint and paint break. <br />One (1)DriverEMS Compt 26" InteriorHeight16"x26" <br />03-05-0622 <br />DRIVER SIDE EMS COMPARTMENT <br />The driver side of the cab shall featurea compartment which is designed for housing emergency <br />medical equipment. Thecompartment shall be located immediately behindthe driver's seat and <br />the interior shall measure 23"wide x 26" tall x 24" deep. <br />10039-001609/02/20 <br />9 <br />PDF created with pdfFactory Pro trial version www.pdffactory.com <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.