My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Two (2) More or Less Custom Rear Mount Pumpers Spec C - Sentinel Emergency Solutions
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - Two (2) More or Less Custom Rear Mount Pumpers Spec C - Sentinel Emergency Solutions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 4:49:49 PM
Creation date
9/14/2020 4:47:53 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/8/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PUMP WARRANTYYES/NO <br />A Waterousfive(5)yearwarranty shallbeprovidedfor the pump. <br />PUMP PLUMBINGWARRANTY <br />YES/NO <br />The stainless-steelplumbing componentsandancillary brassfittingsusedintheconstruction <br />of the water/foamplumbing system shall be warranted fora period of ten(10)years or <br />100,000miles. This coversstructuralfailurescausedby defectivedesignor workmanship, or <br />perforation causedby corrosion,provided the apparatus isusedina normal and reasonable <br />manner. This warrantyisextended onlyto the original purchaser for aperiodoften years <br />fromthe dateofdelivery.A copy of the warrantyshallbe submitted withthebid. (no <br />exception) <br />THREE (3) YEAR MATERIAL AND WORKMANSHIP <br />YES/NO <br />The gold leaflaminationshallbeprovidedwitha three (3) yearmaterialand workmanship <br />limited warranty. The warrantyshallcover the goldleaflaminationas beingfreefrom <br />defects inmaterialand workmanship that wouldariseundernormal use andservice. <br />A copy ofthe warranty certificateshall be submittedwiththebidpackage(No Exception). <br />VEHICLE STABILITY CERTIFICATION <br />YES/NO <br />Thefireapparatusmanufacturershallprovide acertificationstatingtheapparatus complies <br />with NFPA 1901, currentedition,section 4.13, Vehicle Stability. Thecertification shallbe <br />providedatthetimeofbid. <br />ENGINE INSTALLATION CERTIFICATION <br />YES/NO <br />Thefireapparatusmanufacturershallprovide acertification,alongwithaletter from the <br />enginemanufacturerstating theyapproveofthe engineinstallation inthe bidder's chassis. <br />The certification shall be provided atthetime ofbid. <br />POWER STEERING CERTIFICATION <br />YES/NO <br />Thefireapparatusmanufacturershallprovide acertificationstatingthepowersteering <br />systemasinstalledmeetsthe requirementsof the componentsupplier. The certification shall <br />be providedat thetimeofbid. <br />CAB INTEGRITY CERTIFICATION <br />YES/NO <br />Thefireapparatusmanufacturershallprovide acabintegritycertificationwith this proposal. <br />The certification shallstatethat the cab hasbeentestedand certifiedby anindependentthird- <br />partytestfacility. Testingevents shall be documentedwith photographs,real-time and high- <br />speedvideo, vehicleaccelerometers,cartaccelerometers, and alaserspeedtrap.Thefire <br />apparatusmanufacturershallprovidea state-licensedprofessional engineerto witnessand <br />certifyalltesting events. Testing shallmeet orexceed the requirementsbelow: <br />- European OccupantProtection Standard ECE Regulation No.29. <br />- SAE J2422 Cab Roof Strength Evaluation- Quasi-StaticLoading Heavy Trucks. <br />- SAE J2420 COE FrontalStrengthEvaluation- Dynamic Loading Heavy Trucks. <br />- Roof Crush <br />The cabshallbe subjectedto a roofcrush forceof 22,500 lbs. This valuemeetsthe ECE 29 <br />criteria andisequivalenttothefront axlerating upto amaximumof 10metrictons. <br />PDF created with pdfFactory Pro trial version www.pdffactory.com <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.