My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Two (2) More or Less Custom Rear Mount Pumpers Spec C - Sentinel Emergency Solutions
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Bids
>
Opening of Bids - Two (2) More or Less Custom Rear Mount Pumpers Spec C - Sentinel Emergency Solutions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 4:49:49 PM
Creation date
9/14/2020 4:47:53 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/8/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LIGHT SHIELDS <br />Illumination shall beprovided by LED lightsateachpump controlpanelforcontrols, <br />switches,essentialinstructions, gauges,andinstruments necessaryfortheoperation of the <br />apparatus and the equipment provided onit. External illuminationshallbe aminimum offive <br />(5)foot-candleson the face of the device.Internalilluminationshallbe aminimum offour <br />(4)foot-lamberts. <br />Lights shall beinstalled under astainless-steelshield.A light shall comeon above thepump <br />panellight switch whenthe parkingbrake is set. This is to affordtheoperatorsome <br />illumination whenfirst approachingthecontrol panel.A greenpump engagedindicator shall <br />come on atthe operator'spanel whenthe pumpisinOK to Pumpmode. Theremaininglights <br />to beactuatedfrom aswitch located onthe pumppanel. <br />YES/NO <br />LIGHT SHIELD <br />Thereshallbe a polished,16-gaugestainlesssteellight shieldshallbe installed overthe <br />pumpoperators’ panel. <br />·Thereshallbethree (3) 18.00" LED lightsinstalled underthestainless-steellight <br />shieldtoilluminatethecontrols, switches,essential instructions, gauges,and <br />instrumentsnecessaryfor the operationoftheapparatus. Theselightsshallbe <br />activatedby the pump panellight switch. Additionallightsshallbe includedevery <br />18.00"depending onthesize ofthepumphouse. <br />·One (1) pump panellight shall comeon whenthepump isin okto pumpmode.The <br />remaininglights to be actuatedfrom aswitchlocated on the pump panel. <br />Thereshallbe alightactivatedabovethepump panellight switch whentheparking brakeis <br />set. Thisistoaffordtheoperatorsomeilluminationwhenfirstapproachingthecontrol panel. <br />Thereshallbeagreen pump engagedindicatorlightactivated on atthe operator'spanel when <br />YES/NO <br />the pumpisshiftedintogear frominside the cab. <br />ADDITIONAL LIGHTSHIELDS <br />Two (2)additional polished, 16-gaugestainless steellight shieldsshallbe provided above <br />both pumppanels. <br />·Thereshallbethree (3) white LED lightsinstalled underthelight shieldtoilluminate <br />thecontrols, switches,essentialinstructions, gauges,and instruments necessaryfor <br />the operationof the apparatus. Thelights shallbe operatedfroma switchonthe <br />YES/NO <br />pumppanel. <br />ELECTRICAL HARNESSING INSTALLATION <br />To ensurerugged dependability,all 12-volt wiring harnesses installed by the apparatus <br />manufacturershallconform to thefollowing specifications: <br />SAE J1128 - Low tensionprimary cable <br />SAE J1292 - Automobile,truck,truck-tractor,trailerand motor coach wiring <br />SAE J163 - Low tension wiringandcableterminals and spliceclips <br />SAE J2202 - Heavy dutywiring systems for on-highwaytrucks <br />PDF created with pdfFactory Pro trial version www.pdffactory.com <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.