Laserfiche WebLink
South Bend Fire Department <br />One (1)Rub Rails, Spacers,Nylon <br />44-02-2000 <br />NYLON SPACERS FOR RUB RAILS <br />There shall be nylon spacers provided between the rub rail and the body.This shall allow wash <br />out and replacement in the event of damage. <br />One (1)WhlWellPrvsns, Ahd ofWhls LeftSide <br />44-11-5100 <br />WHEEL WELL PROVISION LOCATION <br />The wheel well provisions shall be located on the left side of the apparatus, ahead of the rear <br />wheels. <br />One (1)WhlWellCmpt, Triple SCBA Tube, Pntd Alum Dr <br />44-10-2700 <br />One (1) breathing aircylinder storagecompartment for three(3) SCBA cylinders (not supplied) <br />shall be provided and located in the rear wheel well of the apparatus body. <br />Thecylinderstoragecompartmentshallbeconstructedentirelyofaluminum.Thedoorassemblies <br />shallbeprovidedwithagasketbetweendoorandbodyside,boltedin-placeandremovablefor <br />repair orreplacement. <br />Compartment shall be provided with SCBA cylinder scuff protection. A painted aluminum door <br />shall be installed. <br />Three (3)WhlWellCompt, SCBACompt Straps <br />44-10-6000 <br />Three (3) one-inch (1")wide loop of black webbing shall be installed in each SCBA <br />compartment to prevent the bottle from sliding out of the compartment in case of doorfailure. <br />The loop shall be mounted, centered in the compartment and shall hang within one-inch (1") of <br />the compartment floor toallow the bottle to pass by the strap when the bottle is placed in the <br />compartment. The strapshall loop over the valve. <br />One (1)WhlWellPrvsns, Bhnd Whls Left Side <br />44-11-5300 <br />WHEEL WELL PROVISION LOCATION <br />The wheel well provisions shall be located on the left side of the apparatus, behind of the rear <br />wheels. <br />10040-001909/02/20 <br />85 <br />PDF created with pdfFactory Pro trial version www.pdffactory.com <br /> <br />