Laserfiche WebLink
South Bend Fire Department <br />One (1)Radio Spkr, Fire,Pump Panel <br />27-38-1200 <br />RADIO SPEAKER <br />One (1)externalgraderadio speakerand wiring shall be provided behind the pump panel. <br />One (1)Water Tank, 500 Gal,Pmpr/Tnkr, Poly <br />25-26-1300 <br />WATER TANK - 500 GALLON <br />The apparatus shall be equipped with a five-hundred (500) gallon polypropylene water tank. <br />The tank shall be equipped with a four-inch (4") overflow pipe. <br />One (1)Water Tank, RectangularTank <br />25-25-0062 <br />WATER TANK <br />The apparatus shall be equipped with a rectangular tank. <br />One (1)Water Tank, Fill Tower, 10" x10",<500 Gals <br />25-44-1200 <br />WATER TANK FILLTOWER <br />A fill tower measuring approximately 10” x 10” square shall be providedon the water tank up to <br />and including 500 gallons total capacity. <br />One (1)Water Tank, Base Specs,Poly <br />25-42-1100 <br />The apparatus shall be equipped with a polypropylene water tank. The tank body and end <br />bulkheads shall be constructed of .75" thick, polypropylene, nitrogen-welded and tested inside <br />and out. Tank construction shall conform to applicable NFPA standards. The tank shall carry a <br />lifetime warranty. <br />The transverse and longitudinal .375" thick swash partitions shall be interlocked and welded to <br />each other as well as to the walls of the tank. The partitions shall be designed and equippedwith <br />vent holes to permit air and liquid movement between compartments. <br />The .5" thick cover shall be recessed .375" from the top of the side walls.Hold down dowels <br />shall extend through andbe welded to both the covers and the transversepartitions, providing <br />rigidity during fast fill operations. Drilled and tapped holes for lifting eyesshall be provided in <br />the top area of the booster tank. <br />A combination vent/water fill tower shall be provided at front of the tank.The 0.5" thick <br />polypropylene fill and overflow tower shall be equipped with a hinged lid and a removable <br />polypropylene screen.The overflow tube shall be installed in fill tower and piped with a <br />minimum schedule 40 PVC pipe through the tank. <br />10040-001909/02/20 <br />62 <br />PDF created with pdfFactory Pro trial version www.pdffactory.com <br /> <br />