Laserfiche WebLink
REGULAR MEETING AUGUST 25, 2020 143 <br />Upon a motion made by Ms. Maradik, seconded by Mr. Molnar and carried by roll call, the <br />above quotation was referred to Community Investment and Engineering for review and <br />recommendation. <br />AWARD BID AND APPROVE CONTRACT — SPEED HUMP INSTALLATION — PROJECT <br />NO. 120-043 (PR-00002148) <br />Ms. Charlotte Brach, Engineering, advised the Board that on August 11, 2020, bids were <br />received and opened for the above referenced project. After reviewing those bids, Ms. Brach <br />recommended that the Board award the contract to the lowest responsive and responsible bidder, <br />Premium Concrete Services, Inc., 712 Richmond St„ Elkhart, IN 46516, in the amount of <br />$210,400. Therefore, Ms. Maradik made a motion that the recommendation be accepted, and the <br />bid be awarded, and the contract approved as outlined above. Mr. Molnar seconded the motion, <br />which carried by roll call. <br />AWARD QUOTATION AND APPROVE CONTRACT — VPA PARKING LOT SECURITY <br />GATES (PR-00002135) <br />Mr. Patrick Sherman, Venues, Parks & Arts, advised the Board that on July 28, 2020, quotations <br />were received and opened for the above referenced project. After reviewing those quotations, <br />Mr. Sherman recommended that the Board award the contract to the lowest responsive and <br />responsible bidder, Custom Fence Company, 2265 Reum Rd., Niles, MI 49120, in the amount of <br />$17,292.11. Therefore, Ms. Maradik made a motion that the recommendation be accepted, and <br />the quotation be awarded, and the contract approved as outlined above. Mr. Molnar seconded the <br />motion, which carried by roll call. <br />APPROVE CHANGE ORDER NO. 1 — SMALL DRAINAGE DESIGN AND REPAIR — <br />SAMPSON AND OVERLOOK — PROJECT NO. 118-063B (PO-0000304) <br />Mr. Gilot advised that Ms. Sue Ellen Doudrick, Engineering, has submitted Change Order No. 1 <br />on behalf of HRP Construction, Inc., 5777 Cleveland Rd., PO Box 266, South Bend, IN 46624, <br />indicating the contract amount be increased by $122,458.91 for a new contract sum, including <br />this Change Order, in the amount of $346,638.91. Mr. Gilot noted this Change Order created a <br />54% increase, well exceeding the 20% maximum allowed by State law. He stated there was a <br />memo provided that outlined in great detail the differing site conditions and a conflict with <br />utilities He added there was a need to redesign and move the route several hundred feet that <br />created a substantial increase. Attorney McDaniels stated this differing site conditions meets the <br />unforeseeable conditions criteria that allows for an increase exceeding 20% per State law. Upon <br />a motion made by Ms. Maradik, seconded by Mr. Molnar and carried by roll call, the Change <br />Order was approved. <br />APPROVE CHANGE ORDER NO. 1 — 315 & 319 W. JEFFERSON EXTERIOR <br />RENOVATIONS, DIVISION C — PROJECT NO. 119-064 (PR-0000441) <br />Mr. Gilot advised that Mr. Zach Hurst, Engineering, has submitted Change Order No. 1 on <br />behalf of Walsh & Kelly, Inc., 24358 State Road 23, South Bend, IN 46614, indicating the <br />contract amount be increased by $1,856 for a new contract sum, including this Change Order, in <br />the amount of $47,845. Upon a motion made by Ms. Maradik, seconded by Mr. Molnar and <br />carried by roll call, the Change Order was approved. <br />APPROVE CHANGE ORDER NO. 5 — HISTORIC LEEPER PARK IMPROVEMENTS BID <br />PACKAGE I — PROJECT NO. 118-010A (PO-0000379) <br />Mr. Gilot advised that Mr. Kyle Silveus, Engineering, has submitted Change Order No. 5 on <br />behalf of Ancon Construction Company, Inc., 2146 Elkhart Rd., Goshen, IN 46526, indicating <br />the contract amount be increased by $27,713 and three hundred and sixteen (316) days, for a new <br />contract sum, including this Change Order, in the amount of $1,412,692.86 and a new <br />completion date of October 1, 2020. Upon a motion made by Ms. Maradik, seconded by Mr. <br />Molnar and carried by roll call, the Change Order was approved. <br />APPROVE CHANGE ORDER NO. 3 (FINAL) AND PROJECT COMPLETION AFFIDAVIT <br />— AIRPORT ANNEXATION AREA SANITARY SEWER EXTENSION — PROJECT NO. 117- <br />108 (PR-0000076) <br />Mr. Gilot advised that Mr. Jacob Klosinski, Engineering, has submitted Change Order No. 3 <br />(Final) on behalf of HRP Construction, Inc., 5777 Cleveland Rd., PO Box 266, South Bend, IN <br />46624, indicating the contract amount be increased by $28,020 for a new contract sum, including <br />this Change Order, of $924,359.52. Also submitted was the Project Completion Affidavit <br />