Laserfiche WebLink
Training: <br />Training for City personnel on the safety and the operation of this <br />LL4NO <br />equipment is required as part of any bid submitted herein. Training <br />will include, but not be limited to, those items outlined below. All <br />of the training will take place at the City of South Bend Public <br />Works Center, and any expenses incurred to complete this training <br />will be at the expense of the successful bidder, training materials, <br />and meals for South Bend City employees, including the following: <br />Four (4) operators and Two (2) supervisor Six (6) mechanics <br />At a minimum, the training will include those items set out <br />below: <br />Introduction to Operator's Manual <br />This will include a breakdown of each section of the manual, <br />operational controls, safety shutdown, daily and weekly <br />maintenance, and trouble shooting. <br />Introduction to the Equipment and Proper Maintenance <br />Procedures <br />This will include an overview of the complete maintenance <br />of the entire machine proper scheduled maintenance and <br />adjustments as well as troubleshooting procedures. <br />In-house <br />Upon delivery of the unit to the City of South Bend, the successful <br />LLJNO <br />Training: <br />bidder will provide a factory authorized trainer to do on -street <br />training for the operators. <br />This training will include a review of daily and weekly maintenance <br />and proper operations of this equipment. <br />Training will continue as long as the City of South Bend deems <br />necessary. The successful bidder will be responsible for the cost of <br />training the first two (2) days and the City will pay a reasonable <br />hourly rate for any additional training past that time. Lodging and <br />meals for the trainer are the responsibility of the bidder. <br />Continued <br />Additional information and answers to questions from the City shall <br />) E /NO <br />Training: <br />be provided by the manufacturer for the life of the machine at no <br />cost to the City of South Bend. <br />Inspection and <br />The successful bidder shall arrange a final inspection of the positive <br />YE /NO <br />Delivery: <br />displacement hydro -excavating machine upon delivery with the <br />manager of the City Equipment Services Department. If it is found <br />that the equipment does not conform to the specifications as written, <br />the City reserves the right not to accept the unit until such time as all <br />corrections have been made by the bidder to meet the specifications. <br />