Laserfiche WebLink
Address: 713 W USalle (Reinspection) Avenue Unit: 01-GeneralConditions <br />Location: 1 - General Requirements <br />Spec # Spec <br />Af>f»K«,VVtl8fcr0 CeiBng/PtoorSF: 0 <br />Quantity Units Unit Price Total Price <br />Trade: 219 Lead Abatement <br />containment area will be cleaned to remove any visible dust and <br />debris, and occupants will have safe access to sleeping areas, <br />a bathroom and kitchen facilities. Occupants will not be <br />permitted to enter the work site during the lead hazard reduction <br />activities until after the lead abatement project has been <br />completed and clearance is achieved. Contractor is responsible <br />for ensuring occupant protection is completed in accordance <br />with HUD rules and regulations. <br />LBPGC07 QUANTITY VERIFICATION <br />The quantities herein expressed within the specification are for <br />informational purposes only. Contractors shall be responsible <br />for obtaining their own quantity schedule. INCAA shall not be <br />held liable for any difference in estimated and actual quantities; <br />therefore, change orders will not be approved for differences in <br />quantities. Contractors shall immediately notify the INCAA <br />during the bidding process if field measurements vary <br />significantly from those estimated within this specification. <br />Contractor's bid shall be reflective of completing specified work <br />to eliminate lead hazards at the project site. <br />LBPGC08 CLEAN TO CLEARANCE <br />After completion of all lead hazard reduction activities, all work <br />areas shall be cleaned for clearance. Typical work practices <br />include, but are not limited to: wet mist, fold and remove all <br />containment polyethylene sheeting; HEPA vacuum all visible <br />surfaces including walls, floors, ceilings and window troughs <br />from the top down; detergent scrub all horizontal surfaces in <br />small sections using a 3-bucket system, changing rinse water <br />every 250 SF; completely rinse with clean water and new <br />equipment. After surfaces are dry, HEPA vacuum all visible <br />surfaces except ceiling. <br />Contractor may also elect to install new floors, seal horizontal <br />surfaces, paint concrete floors, or utilize other means and <br />methods to ensure lead dust hazards are resolved and <br />clearance is acheived. Any new flooring must be pre-approved <br />by homeowner. <br />The following lead dust hazards were identified in the residence <br />and must be addressed: <br />713-Apt 1 <br />Room 1 - Living Room - Window Sills and Floor <br />Room 2 - Dining Room - Floor <br />Room 3 - Bedroom - Window Sills <br />Room 6 - Kitchen - Window Sills <br />Room 9 - Laundry - Floor <br />713.5-Apt 2 <br />Room 4 - Bedroom - Window Sills <br />Room 6 - Kitchen - Floor <br />1.00 AL n/a n/a <br />1.00 DU job $4,000 <br />LBPGC09 WALL NAMING PROTOCOLS 1.00 EA n/a n/a <br />Page 2 of 24