My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
713 W LaSalle Avenue_AA 2020-0224 amended
sbend
>
Public
>
Historic Preservation
>
2020
>
Agendas & Packets
>
September
>
Administrative Approvals
>
713 W LaSalle Avenue_AA 2020-0224 amended
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2020 12:23:57 PM
Creation date
9/2/2020 11:58:19 AM
Metadata
Fields
Template:
South Bend HPC
HPC Street Address
713 West LaSalle Avenue
HPC Document Type
Certification
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Address: 713 W USalle (Reinspection) Avenue Unit: 01-GeneralConditions <br />Location: 1 - General Requirements <br />Spec # Spec <br />Af>f»K«,VVtl8fcr0 CeiBng/PtoorSF: 0 <br />Quantity Units Unit Price Total Price <br />Trade: 219 Lead Abatement <br />containment area will be cleaned to remove any visible dust and <br />debris, and occupants will have safe access to sleeping areas, <br />a bathroom and kitchen facilities. Occupants will not be <br />permitted to enter the work site during the lead hazard reduction <br />activities until after the lead abatement project has been <br />completed and clearance is achieved. Contractor is responsible <br />for ensuring occupant protection is completed in accordance <br />with HUD rules and regulations. <br />LBPGC07 QUANTITY VERIFICATION <br />The quantities herein expressed within the specification are for <br />informational purposes only. Contractors shall be responsible <br />for obtaining their own quantity schedule. INCAA shall not be <br />held liable for any difference in estimated and actual quantities; <br />therefore, change orders will not be approved for differences in <br />quantities. Contractors shall immediately notify the INCAA <br />during the bidding process if field measurements vary <br />significantly from those estimated within this specification. <br />Contractor's bid shall be reflective of completing specified work <br />to eliminate lead hazards at the project site. <br />LBPGC08 CLEAN TO CLEARANCE <br />After completion of all lead hazard reduction activities, all work <br />areas shall be cleaned for clearance. Typical work practices <br />include, but are not limited to: wet mist, fold and remove all <br />containment polyethylene sheeting; HEPA vacuum all visible <br />surfaces including walls, floors, ceilings and window troughs <br />from the top down; detergent scrub all horizontal surfaces in <br />small sections using a 3-bucket system, changing rinse water <br />every 250 SF; completely rinse with clean water and new <br />equipment. After surfaces are dry, HEPA vacuum all visible <br />surfaces except ceiling. <br />Contractor may also elect to install new floors, seal horizontal <br />surfaces, paint concrete floors, or utilize other means and <br />methods to ensure lead dust hazards are resolved and <br />clearance is acheived. Any new flooring must be pre-approved <br />by homeowner. <br />The following lead dust hazards were identified in the residence <br />and must be addressed: <br />713-Apt 1 <br />Room 1 - Living Room - Window Sills and Floor <br />Room 2 - Dining Room - Floor <br />Room 3 - Bedroom - Window Sills <br />Room 6 - Kitchen - Window Sills <br />Room 9 - Laundry - Floor <br />713.5-Apt 2 <br />Room 4 - Bedroom - Window Sills <br />Room 6 - Kitchen - Floor <br />1.00 AL n/a n/a <br />1.00 DU job $4,000 <br />LBPGC09 WALL NAMING PROTOCOLS 1.00 EA n/a n/a <br />Page 2 of 24
The URL can be used to link to this page
Your browser does not support the video tag.