My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Olive Street Station Roof Repairs Proj No. 120-028 - Midland Engineering Company, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening of Quotes - Olive Street Station Roof Repairs Proj No. 120-028 - Midland Engineering Company, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2020 8:48:51 AM
Creation date
8/26/2020 8:48:21 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/25/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
B. Contractor shall furnish a written ten (10) year guarantee on the following <br />described work and shall cite at least ten (10) buildings so done, with dates of <br />completion, as evidence of his ability to perform the work and fulfill the terms of <br />the Guarantee. Contractors shall provide Owner with statement of protection <br />against loss arising from use of any patents or patents pending in connection <br />with this work. <br /> <br />1.6 ENVIRONMENTAL CONDITIONS: <br /> <br />A. Tuckpointing operations shall not be performed below 40 degrees F or above 95 <br />degrees F. <br /> <br />PART 2 - PRODUCTS <br /> <br />2.1 WATER: <br /> <br />A. Water for chemical dilution and for pressure washing must be clean, potable and <br />free of any chemicals such as iron or copper which may cause a surface <br />disfigurement. <br /> <br />2.2 TUCKPOINTING MORTAR MATERIALS: <br /> <br />A. Approved Manufacturers: <br />1. Jahn Restoration Mortars by Cathedral Stone Products, Inc. <br />a. M110 Historic Pointing Mortars. <br />B. Water: Clean and potable. <br /> <br />2.5 SEALANT MATERIALS <br /> <br />A. Sealants: <br />1. Tremco DYMERIC - Three part epoxidized polyurethane <br />2. Tremco DYMONIC Polyurethane or approved equal. <br /> <br />B. Cleaners and Primers: <br />1. Furnish Tremco 200 cleaner for use with Tremco Sealants. <br />2. Furnish manufacturer's recommended primers for application to the <br />various substrates. <br /> <br />C. Backer Rods: <br />1. Backer Rod: Closed cell polyethene foam equal to "HBR" backer rod as <br />manufactured by Hercules, Inc., or approved equal. <br /> <br />PART 3 - EXECUTION <br /> <br />3.1 WORKMANSHIP <br /> <br />A. Job Superintendent: This Contractor shall have a job superintendent (foreman), <br />who is known for his integrity and expertise in this type of work, on the Project full <br />time once the work is started. <br /> <br />MASONRY RESTORATION REPAIR <br />04920-2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.