My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Olive Street Station Roof Repairs Proj No. 120-028 - Midland Engineering Company, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening of Quotes - Olive Street Station Roof Repairs Proj No. 120-028 - Midland Engineering Company, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2020 8:48:51 AM
Creation date
8/26/2020 8:48:21 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/25/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2.The Contractor shall preserve and protect all surrounding property, structures, tenants, <br />visitors and their property from damage caused by the Contractor’s operations. <br />3.Architectural site improvements shall be completed in accordance with plan details and <br />separate architectural specifications. <br />XVIII.PLANS <br />A. Prevailing Specifications: City of South Bend Design and Construction Standards <br />B. Additions: <br />1.Roof Repair <br />a.The plans consist of three (3) sheets. <br />2.The work shall conform to the plans. <br />3.The drawings are schematic in nature. <br />4.The CONTRACTOR is responsible for estimating dimensions and quantitiesof materials. <br />5.In the event that the Special Provisions and the Plansconflict, the Special Provisionsshall <br />govern. <br />XIX.MUNICIPAL OPERATIONS <br />A. Prevailing Specifications: None <br />B. Additions: <br />1.The Contractor shall coordinate with the City of South Bend Solid Waste, Olive Street <br />office personnel, Waste Management, and other pickup services as requested to ensure <br />collection services are maintained. <br />2.The Contractor shall be responsible for snow removal within the project limits and shall <br />coordinate with City of South Bend Public Works. The Contractor is responsible for <br />protecting his project site from excessive wear and tear during snow removal. <br />Version 7/01/2016 Special Provisions - 7 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.