My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Olive Street Station Roof Repairs Proj No. 120-028 - Midland Engineering Company, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Opening of Quotes/Proposals
>
Opening of Quotes - Olive Street Station Roof Repairs Proj No. 120-028 - Midland Engineering Company, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2020 8:48:51 AM
Creation date
8/26/2020 8:48:21 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/25/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
XIV.RETAINAGE AND FINAL PAYMENT <br />A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 109 <br />B. Additions: <br />1.Payments will be made every thirty (30) calendar days. <br />2.Consistent with provisions of IC 36-1-12-14, the Board of Public Works shall retain a <br />percentage of payments throughout the duration of the project. <br />3.Before final payment and retainage are released the Contractor must satisfy the following: <br />a.All parts and labor meet requirements stated in the specifications. <br />b.Provide copies of test reports or cut sheets on all materials supplied. <br />c.Provide As-Built drawings in accordance with the City of South Bend Prevailing <br />Specifications for Public Works. <br />d.One (1) copy of the City of South Bend Completion Affidavit and one (1) copy of a Final <br />Waiver of Lien. <br />XV.WARRANTY <br />A. Prevailing Specifications: None <br />B. Additions: <br />1.All parts shall include the following: <br />(i) Performance specifications; <br />(ii) Bill of materials <br />(iii) Warranties on all parts; and <br />(iv) Installation and safety requirements. <br />XVI.OTHER UTILITIES <br />A. Prevailing Specifications: None <br />XVII.DESCRIPTION OF WORK <br />A. Prevailing Specifications: None <br />B. Additions: <br />1.Work to be performed shall include furnishing all labor, services, materials, insurance, labor <br />and equipment to provide and install the Olive St Station Roof Repair project including, but <br />not limited to, facia and gutter repair, remove clay tile, replace damaged substrate, replace <br />clay tile, according to the intent of the plans and specifications, according to the intent of <br />the plans and specifications. <br />Version 7/01/2016 Special Provisions - 6 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.