My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No. 2 to PSA - Additional Locations for On-Call Survey Right-of-Way Services – Jones Petrie Rafinski Corp
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No. 2 to PSA - Additional Locations for On-Call Survey Right-of-Way Services – Jones Petrie Rafinski Corp
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 8:41:55 AM
Creation date
7/29/2020 9:21:58 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/28/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT K, consisting of 3 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated June 12, 2018. <br />AMENDMENT TO OWNER -ENGINEER AGREEMENT <br />Amendment No. 2 <br />1. Background Data: <br />06-12-2018 <br />a. Effective Date of Owner -Engineer Agreement: <br />b. Owner: Department of Public Works, City of South Bend, Indiana <br />C. Engineer: Jones Petrie Rafinski Corporation (JPR <br />d. Project: On -Call Survey/Right-of-Way Services (4118-065) <br />2. Description ofModications: <br />[NOTE TO USER: Include the following paragraphs that are appropriate and delete those not applicable to <br />this amendment. Refer to paragraph numbers used in the Agreement or a previous amendment for clarity <br />with respect to the modifications to be made. Use paragraph numbers in this document for ease of <br />reference herein and in future correspondence or amendments.] <br />a. Engineer shall perform or furnish the following Additional Services: <br />The initial project scope for this On -Call Survey/Right-of-Way Services agreement is <br />to have JPR under contract to perform various survey tasks as requested by the City of <br />South Bend, Board of Public Works. Several projects have been assigned and have <br />either been completed or partially completed. The following are a list of projects that <br />have either been completed or are currently being worked on: <br />During the design process the following items have been added to the initial project <br />scope: <br />1) Portage -Boland R/W Acquisition (COMPLETE): JPR originally prepared Right - <br />of -Way Engineering Documents for the roundabout at Portage Avenue/Boland <br />Drive on July 6, 2018. Subsequently a request to prepare a Deed of Dedication Plat <br />for said area was prepared and submitted on August 15, 2019 <br />2) McKinley Avenue Topographic Survey (COMPLETE): JPR was requested to <br />prepare a topographic survey for a portion of McKinley Avenue east of Ironwood <br />Drive where the north edge of pavement was eroding. <br />3) 4502 South Michigan Street Easement (COMPLETE): JPR was requested to <br />prepare an easement for the City's existing sanitary sewer located on private <br />property. <br />Page 1 <br />(Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright �) 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.