Laserfiche WebLink
4) Privet Lane Topographic Survey (COMPLETE): JPR was requested to prepare a <br />topographic survey for the failing structure located on Privet lane. <br />5) Laurel Woods Structure Survey (COMPLETE): JPR was requested to collect <br />existing structure data for various structures in the Laurel Woods area for <br />determining issues with existing storm drainage. <br />6) Nimtz Parkway Boundary Survey/Easement Preparation (CURRENT/ACTIVE): <br />JPR was requested to prepare a boundary survey and easement description for a <br />City owned parcel for the Nimtz Parkway Retention Basin. This is an active <br />project. <br />7) Drainage Request areas (CURRENT/ACTIVE): topographic surveys requested for <br />the following areas to correct drainage issues: Marion Street (Williams St. to <br />Lafayette Blvd.), Fox Street (High St. to Dale Ave,), Beale Street (Inglewood Pl. to <br />Sherman Ave.), Huey Street (Pershing St. to Bergan St.), Elmer Street (Pershing St. <br />to Bergan St.), and Kaley Street (Right-of-way to drainage ditch) <br />b. The Scope of Services currently authorized to be performed by Engineer in accordance <br />with the Agreement and previous amendments, if any, is modified as follows: <br />c. The responsibilities of Owner are modified as follows: <br />d. For the Additional Services or the modifications to services set forth above, Owner <br />shall pay Engineer the following additional or modified compensation: <br />Construction Documents $21,500.00 <br />Total Additional Services Request $21,500.00 <br />e. The schedule for rendering services is modified as follows: <br />f. Other portions of the Agreement (including previous amendments, if any) are modified <br />as follows: <br />3. Agreement Summary (Reference only) <br />a. Original Agreement amount: $10,000.00 <br />b. Net change for prior amendments: $6,000.00 <br />c. This amendment amount: $21,500.00 <br />d. Adjusted Agreement amount: $37,500.00 <br />Please note that the basis of payment and hourly rates set forth in the original Professional Services <br />Agreement dated June 12, 2018 is applicable to this amendment. <br />The foregoing Agreement Summary is for reference only and does not alter the terms of the Agreement, <br />including those set forth in Exhibit C. <br />Page 2 <br />(Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright �) 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />