My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No. 2 to PSA - Additional Locations for On-Call Survey Right-of-Way Services – Jones Petrie Rafinski Corp
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No. 2 to PSA - Additional Locations for On-Call Survey Right-of-Way Services – Jones Petrie Rafinski Corp
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2020 9:22:02 AM
Creation date
7/29/2020 9:21:58 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/28/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4)Privet Lane Topographic Survey (COMPLETE): JPR was requested to prepare a <br />topographic survey for the failing structure locatedon Privet lane. <br />5)Laurel Woods Structure Survey (COMPLETE): JPR was requestedtocollect <br />existing structure data for variousstructures in the Laurel Woods area for <br />determining issues with existing stormdrainage. <br />6)Nimtz Parkway Boundary Survey/EasementPreparation (CURRENT/ACTIVE): <br />JPR was requested to prepare a boundary survey and easement descriptionfor a <br />City owned parcelfor the Nimtz Parkway Retention Basin. This is an active <br />project. <br />7)Drainage Request areas(CURRENT/ACTIVE):topographicsurveys requested for <br />the followingareas to correct drainage issues:MarionStreet (Williams St.to <br />Lafayette Blvd.),Fox Street (High St. toDaleAve,),Beale Street (Inglewood Pl. to <br />Sherman Ave.), Huey Street (Pershing St.to Bergan St.), Elmer Street (Pershing St. <br />to Bergan St.), and Kaley Street(Right-of-way to drainage ditch) <br />b.The Scope of Services currently authorized to be performed by Engineerin accordance <br />with the Agreement and previous amendments, if any, is modified as follows: <br />c.The responsibilities of Owner are modified as follows: <br />d.For the Additional Services or the modifications to services set forth above, Owner <br />shall pay Engineer the following additional or modified compensation: <br />Construction Documents$21,500.00 <br />Total Additional Services Request$21,500.00 <br />e.The schedule for rendering services is modified as follows: <br />f.Other portions of the Agreement (including previous amendments, if any) are modified <br />as follows: <br />3.Agreement Summary (Reference only) <br />a. Original Agreement amount: $10,000.00 <br />b. Net change for prior amendments: $6,000.00 <br />c. This amendmentamount:$21,500.00 <br />d. Adjusted Agreement amount:$37,500.00 <br />Please note that the basis of payment and hourly rates set forth in the original Professional Services <br />Agreement dated June 12, 2018 is applicableto this amendment. <br />The foregoing Agreement Summary is for reference only and does not alter the terms of the Agreement, <br />including those set forth in Exhibit C. <br />Page 2 <br />(Exhibit K –(Amendment to Owner-Engineer Agreement) –Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright ©2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.