My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
No. 3072 approving/authorizing the execution of an addendum to the Master Agency Agreement (Ireland Road Right of Way Acquisition Services)
sbend
>
Public
>
Redevelopment Commission
>
Resolutions
>
No. 3072 approving/authorizing the execution of an addendum to the Master Agency Agreement (Ireland Road Right of Way Acquisition Services)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2013 9:20:47 PM
Creation date
10/10/2012 3:04:49 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
15. When directed by the OWNER, the ENGINEER shall prepare <br />condemnation reports for unsecured parcels. <br />16. The ENGINEER shall provide assistance in the event of condemnation as <br />Additional Services as identified in Appendix "E ". <br />F. For secured parcels, the ENGINEER shall provide document recording services <br />including the following activities: <br />1. For parcels involving acquisition of permanent right of way, the <br />ENGINEER shall obtain County Assessor's approval of sales disclosure <br />forms, verification of parcel tax identification numbers and County <br />Assessor stamp on documents as verification of County Assessor receipt <br />prior to submission to County Auditor. <br />2. The ENGINEER shall submit applicable documents for recording to the <br />County Auditor for review and to obtain Auditor stamp as verification of <br />receipt by County Auditor prior to submission to County Recorder for <br />recording. <br />3. The ENGINEER shall submit applicable documents for recording to the <br />County Recorder. <br />4. The ENGINEER shall obtain original recorded documents from the County <br />Recorder subsequent to completion of recording activities. <br />IL G. The ENGINEER shall provide the following Deliverables to the OWNER: <br />1. Final right of way parcel files for OWNER records. <br />2. Original recorded documents. <br />H. The ENGINEER shall attend such conferences with the OWNER and other <br />interested parties and /or agencies, as may be required, in connection with this <br />work. <br />I. Services resulting from significant changes in the general scope, extent or <br />character of the Project or its design including, but not limited to, changes in size, <br />complexity, OWNER's schedule, character of construction or method of <br />financing; and revising previously accepted studies, reports, design documents <br />or Contract Documents when such revisions are required by changes in laws, <br />rules, regulations, ordinances, codes or orders enacted subsequent to the <br />preparation of such studies, reports, or documents, or are due to any other <br />causes beyond the ENGINEER's control, shall require a change in work as <br />provided by Section VI - General Provisions, Paragraph 12 titled "Changes in <br />Work ". <br />C, Ireland Road Right of Way Acquisition Services APPENDIX "A" <br />September 2012 <br />Page 3of3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.