Laserfiche WebLink
DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />Tfxfs'NboipmfSfibcjmjubujpo <br />229.1:43 <br />Project Number: _______________ Project Name: __________________________ Change Order #: ____ <br />302103131 <br />DATE INITIATED:BPW DATE: <br />Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). <br />BeefeMjojohpoIvspoTusffuevfupdpmmbqtjohtfxfs/ <br />Attachments: (List documents support changerequired) <br />DpousbdupsQspqptbm/ <br />35-836/21 <br />Amount of Increase / Decrease: $____________________ <br />Categories (Pick One): <br />81-489/11 <br />Scope of Work <br />Previously approved Change Order(s): $___________________ <br />Differing Site Conditions, Changed Conditions <br />/88 <br />Current Percent of Change: ____________________ % <br />Conflicted Specifications and Drawings <br />Failed Materials <br />4-32:-48:/71 <br />New Total Amount: $____________________ <br />Error <br />Omission <br />4/15 <br />Total Percent of Change: ____________________ % <br />Final Quantity Adjustment <br />_______________________ <br />753.1732.526/53.16)VujmjuzFyqfotf* <br />Funding Secured From: __________________________ <br />(filled out by PM) <br />RECOMMENDEDBY: <br />KptiFinfs302103131 <br />Project Inspector (Print Name)(Signature)(Date) <br />REVIEWED BY: <br />Construction Manager (Print Name)(Signature)(Date) <br />APPROVED BY: <br />TvfFmmfoEpvesjdl704103131 <br />Engineering Project Manager (Print Name)(Signature)(Date) <br />APPROVED BY: <br />City Engineer (Print Name)(Signature)(Date) <br /> <br />