Laserfiche WebLink
shall be calculated as the relationship between the Average Daily Flow reported in the sewer <br />capacity certification for the structure and 310 gallons per day. <br />Notwithstanding the foregoing, the SDC is subject to adjustment in accordance with <br />applicable City ordinances. <br />7. Dedication <br />Upon completion of the construction of the Dedicated Improvements substantially as <br />depicted in Exhibit A, the Owner shall convey easements for public water main that exists through <br />the site, and dedicate to the City within such easement the Dedicated Improvements as public <br />infrastructure. <br />It is understood by the Owner that no dedication shall be accepted by the City until all <br />required easements have been conveyed, accepted, and recorded by the City. The Owner shall use <br />its best efforts to work with the City to ensure that the Dedicated Improvements are dedicated to <br />the City in a timely manner. Additionally, prior to dedication, the following must be satisfied: <br />a. All parts and labor must meet the standards and requirements stated in the design <br />specifications as presented to and accepted by the City Engineering Department. <br />b. Lien waivers must be received with regard to all workmanship and materials used in <br />connection with these improvements. <br />c. The Completion Affidavit must be furnished to Owner by the Board of Public Works. <br />d. Owner must provide copies of test reports or cut sheets on all materials supplied. <br />e. Owner must provide As -Built drawings in accordance with the City of South Bend <br />Prevailing Specifications for Public Works, which may be found at <br />https://southbendin. gov/wp-content/uploads/20l 8/O7/SBN-Spec-Stand-FINAL-062618- <br />REV-2 BPWSi nature.pdf <br />