Laserfiche WebLink
notice. Surety shall be posted in perpetuity until the acceptance of the Completion Affidavit, <br />Maintenance Bond, and Waiver of Lien. <br />5. Maintenance Bond <br />Within ten (10) days of City's acceptance of the Dedicated Improvements, Owner shall provide <br />the City with a maintenance bond equal to ten percent (10%) of the construction cost covering all <br />work performed or to be performed pursuant to this Agreement, and such bond shall remain in <br />effect for three (3) years after dedication as described in Section 7 below. <br />6. Capital Contribution <br />The City acknowledges that system development charges (the "SDC") for the access to the <br />City's water and sanitary sewer systems will be paid on an individual basis by each customer. <br />For purposes of this Agreement, an equivalent residential unit ("ERU") shall mean a single-family <br />residence. For purposes of customers that are not single-family residences, one ERU shall equal <br />estimated wastewater and water flows of 310 gallons per day, respectively. No customer will be <br />less than one ERU. <br />For every new connection to the South Bend Municipal Sewer Works, a capital contribution <br />of $1,145 shall be collected per ERU. For every new connection to the South Bend Municipal <br />Water Works, a system development charge of five hundred dollars ($500.00) shall be collected <br />per ERU and additional portion thereof to be connected. All charges shall be paid to the City at <br />the time the application for connection is filed. For all other types of structures, the ERU <br />calculation shall be based upon the ratio of Average Daily Flow as computed pursuant to 327 IAC <br />3-6-11 in relationship to 310 gallons per day. For structures not listed in 327 IAC 3-6-11, the ERU <br />