Laserfiche WebLink
<br />a)Modify the bridge design as required for additional water main <br />loading. <br />b) Design the structural bridge support system for the water main. <br />c) Design the water main, insulation, heat trace, and jacketing system. <br />d) Design the electrical power supply and monitoring system. <br />e) Provide sequencing of construction guidance development. <br /> <br />2) ADD Item A.7.a.4 in Exhibit A Paragraph A1.02 Final Design Plans as follows: <br /> <br />4) IDEM Notice of Intent for Water Main Construction <br /> <br /> <br />c. For the Additional Services or the modifications to services set forth above, <br />Owner shall pay Engineer the following additional or modified compensation: <br /> <br />1) ADD Items A.1.a.8 and A.1.a.8 to Exhibit C Paragraph C2.01 Compensation <br />for Basic Services as follows: <br /> <br /> 8) Water Main Design $19,800.00 <br /> 9) Water Main Notice of Intent $1,000.00 <br /> <br />2) REVISE the Total Lump Sum Fee in Exhibit C Paragraph C2.01 <br />Compensation for Basic Services as follows: $116,800.00 <br /> <br />3) REVISE Item A.1.a in Exhibit C Paragraph C2.01 Compensation for Basic <br />Services as follows: <br />a. Bidding Phase and Construction Phase Office Services (Hourly Rate) <br />$14,800 <br /> <br />4) REVISE the Total Hourly Rate Fee in Exhibit C Paragraph C2.01 <br />Compensation for Basic Services as follows: $16,800.00 <br /> <br /> <br />e. The schedule for rendering services is modified as follows: <br />1) DELETE Items A.9 and A.10 in Exhibit A Paragraph A1.00 Project Schedule <br /> <br /> <br />5. Agreement Summary (Reference only) <br /> a. Original Agreement Lump Sum amount: $____$96,000.00_______ <br /> b. Original Agreement Hourly Rate amount: $____$ 12,800.00______ <br /> <br /> c. Net change for prior amendments: $_____n/a____________ <br /> d. This amendment Lump Sum amount: $____$20,800.00_______ <br /> e. This amendment Hourly Rate amount: $____$ 4,000.00_______ <br /> f. Adjusted Agreement Lump Sum amount: $___$116,800.00_______ <br />g. Adjusted Agreement Hourly Rate amount: $____$16,800.00_______ <br /> <br />Page 2 <br />(Exhibit K (Amendment to Owner-Engineer Agreement) Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br /> <br />